2.6km |
25/02/2022 |
CONDITIONAL |
Kyleagarry Ballyryan East and Gortdrum , Donohill |
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. |
Details... |
2.7km |
17/02/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Donohill |
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. |
Details... |
2.6km |
08/02/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary |
a 10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.... login required. |
Details... |
2.6km |
28/01/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary |
a10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4... login required. |
Details... |
2.6km |
02/12/2021 |
CONDITIONAL |
Oola Hills West , Oola , Co. Limerick |
construction of a dwelling house, domestic garage, entrance, to sink a well and installation of a wastewater treatment system and all ancillary site works ... login required. |
Details... |
1.3km |
30/09/2021 |
CONDITIONAL |
Ballybeg , Oola , Co. Limerick |
the construction of a dwelling house, detached garage, recessed site entrance, wastewater treatment system with all ancillary site works... login required. |
Details... |
1.6km |
23/08/2021 |
CONDITIONAL |
Lower Monard , Monard , Co. Tipperary |
a single storey dwelling, site entrance, wastewater system and raised polishing filter, rainwater harvesting system, separate garage and all associated site works... login required. |
Details... |
1.5km |
28/07/2021 |
CONDITIONAL |
Barnanalleen and Lisheennamalausa , Co. Tipperary |
a 10 year planning permission for a solar development on a 39 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; Upgrading of existing laneway to permit access to a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); Security fencing around the proposed su... login required. |
Details... |
1.6km |
22/07/2021 |
N/A |
Barnanalleen and Lisheennamalausa , Co. Tipperary |
a 10 year planning permission for a solar development on a 39 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; Upgrading of existing laneway to permit access to a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); Security fencing around the proposed su... login required. |
Details... |
1.6km |
05/07/2021 |
N/A |
Barnanalleen and Lisheennamalausa , Co Tipperary |
a 10 year planning permission for a solar development on a 42.2 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be be upgraded and internal accesses; Upgrading of existing laneway to permit access a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); security fencing around the proposed s... login required. |
Details... |
3km |
21/06/2021 |
N/A |
Ayle , Oola , Co. Tipperary |
construction of slatted shed incorporating underground effluent tank with crush/holding/loose and storage areas and all associated site works... login required. |
Details... |
560m |
04/06/2021 |
CONDITIONAL |
Seskin , Monard , Co. Tipperary |
extension to farmyard consisting of cattle shed with underground slurry storage and a fodder store... login required. |
Details... |
2.5km |
15/01/2021 |
CONDITIONAL |
Ballyryan West , Co. Tipperary |
demolition of existing single-storey dwelling and outbuilding and construction of a new one and a half storey, part single-storey dwelling, with separate ... login required. |
Details... |
2.5km |
18/12/2020 |
N/A |
Ballyryan West , Co. Tipperary |
demolition of existing single-storey dwelling and outbuilding and construction of a new one and a half storey, part single-storey dwelling, with separate ... login required. |
Details... |
1.9km |
22/10/2020 |
CONDITIONAL |
Clonbrick , Cappawhite , Co. Tipperary |
a hay, straw and machinery shed and all associated site works... login required. |
Details... |
1.9km |
08/10/2020 |
N/A |
Clonbrick , Cappawhite , Co. Tipperary |
a hay, straw and machinery shed and all associated site works... login required. |
Details... |
3km |
12/05/2020 |
CONDITIONAL |
Clonganhue , Cappawhite , Co. Tipperary |
construction of a two storey dwelling house, entrance, treatment unit, percolation area and all associated site works... login required. |
Details... |
60m |
17/04/2020 |
CONDITIONAL |
Knockphelagh , Monard , Co. Tipperary |
construction of dwelling, domestic garage, site entrance, install effluent treatment system including all associated site development works... login required. |
Details... |
2.3km |
21/02/2020 |
CONDITIONAL |
Reaskavalla , Tipperary , Co. Tipperary |
1. Demolition of an existing agricultural livestock shed, 2. Construction of a new agricultural livestock shed, milking parlour, dairy, collecting yard & meal bin, 4. Retention Planning is also sought for an existing livestock shed, 5. All associated site works ... login required. |
Details... |
2.3km |
11/02/2020 |
N/A |
Reaskavalla , Tipperary , Co. Tipperary |
1. demolition of an existing livestock shed 2. construction of a new agricultural livestock shed, milking parlour, dairy, collecting yard and meal bin 3. Retention Planning for an existing livestock shed 4. all associated site works... login required. |
Details... |