2.6km |
05/05/2022 |
N/A |
Lackamore , Lahinch , Co. Clare |
to construct dwelling house, garage, waste water treatment system, entrance/exit and all ancillary works ... login required. |
Details... |
3km |
17/02/2022 |
CONDITIONAL |
Ballyvaskin North , Miltown Malbay , Co Clare |
of the following; a) the alterations to the existing dwelling house b) the garage/shed as constructed along with associated site works... login required. |
Details... |
2.8km |
15/02/2022 |
N/A |
Cloughaun More Td , Miltown Malbay , Co Clare |
to upgrade / improve existing access road for the purposes of extracting timber... login required. |
Details... |
810m |
20/12/2021 |
N/A |
Ballynew , Miltown Malbay , Co Clare |
to build a new Dwelling House, Garage, bore a well, install a wastewater treatment system & all other associated site and ancillary works... login required. |
Details... |
1.5km |
15/12/2021 |
CONDITIONAL |
Glendine North , Miltown Malbay , Co Clare |
to construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works... login required. |
Details... |
990m |
09/12/2021 |
CONDITIONAL |
Kilcorcoran , Miltown Malbay , Co Clare |
to build a Dwelling House, install a Wastewater Treatment System & all other associated site and ancillary works... login required. |
Details... |
2.7km |
18/11/2021 |
REFUSED |
Glendine North Fahanlunaghta More Curraghodea , Letterkelly Cloghaun More Tooreen Silverhill , Doonsallagh East and Knockalassa Co Clare |
for a ten-year planning PERMISSION for the construction of a renewable energy development at this site, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Tooreen, Silverhill, Doonsallagh East and Knockalassa, Co. Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: 1. 8 No. wind turbines with an overall ground-to-blade tip height in the range of 175 metres maximum to 173 metres minimum; a blade length in the range of 75 metres maximum to 66.5 metres minimum; and hub height in the range of 108.5 metre maximum to 100 metres minimum; 2. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning; 3. A Meteorological Mast with a height of 30 metres; 4. All associated underground electrical cabling (33kV) connecting the proposed turbines via Ring Main Unit (RMU) to the 110kV substation in the townland of Knockalassa; 5. P... login required. |
Details... |
2.2km |
30/08/2021 |
CONDITIONAL |
Knockloskeraun , Miltown Malbay , Co Clare |
to construct slatted shed with underground effluent tank and all associated site works ... login required. |
Details... |
2.8km |
18/08/2021 |
CONDITIONAL |
Illaun , Miltown Malbay , Co Clare |
to add a rear single storey extension to existing dwelling house along with associated site works... login required. |
Details... |
700m |
09/07/2021 |
CONDITIONAL |
Ballynew Td , Miltown Malbay , Co Clare |
to construct a new dwelling house, garage, waste water treatment system including all ancillary site services and works... login required. |
Details... |
130m |
05/05/2021 |
CONDITIONAL |
Slievenalicka , Miltown Malbay , Co Clare |
to demolish an exiting extension and construct a new single story extension to the rear of dwelling house along with ancillary site works... login required. |
Details... |
2km |
19/04/2021 |
REFUSED |
Glendine North Fahanlunaghta More Curraghodea , Letterkelly Cloghaun More Cloghaun Beg Tooreen Silverhill , Doonsallagh East Shanavogh East and Knockalassa Co Clare |
for a ten-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun Beg, Tooreen, Silverhill, Doonsallagh East, Shavavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown malbay), The development will consist of the provision of the following I. Up to 8 no. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological mast with a maximum height of up to 30 metres; iv. Underground cabling (33kV) connecting the proposed... login required. |
Details... |
1.7km |
04/03/2021 |
CONDITIONAL |
Kilfarboy , Miltown Malbay , Co Clare |
to construct a two storey extension to include a re-located bedroom to facilitate a home office, a utility room and a plant room ... login required. |
Details... |
2.4km |
13/01/2021 |
UNCONDITIONAL |
Glendine South , Miltown Malbay , Co Clare |
to Extend the Appropriate Period of Planning Permission of P15-789 to alter and extend existing dwelling house, as well as associated site works... login required. |
Details... |
2.6km |
03/11/2020 |
N/A |
Glendine North Fahanlunaghta More , Curraghodea LetterKelly Cloghaun More Cloghaun Beg , Silverhill Doonsallagh East Shanavogh East and Knockalassa Co. Clare |
for a 10-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun beg, Silverhill, Doonsallagh East, Shanavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: i. Up to 8 No. wind turbines with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological Mast with a maximum height of up to 110 metres; iv. Underground cabling (33kV) connecting the proposed tur... login required. |
Details... |
250m |
30/10/2020 |
CONDITIONAL |
Slievenalicka , Miltown Malbay , Co Clare |
the development will consist of the replacement of existing substandard dwelling with a new dwelling house and the replacement of existing septic tank with a proprietary wastewater treatment system and polishing filter together with ancillary works... login required. |
Details... |
2km |
24/09/2020 |
CONDITIONAL |
Kilcorcoran , Miltown Malbay , Co Clare |
to construct a new dwelling house, private garage, site entrance, on-site sewerage treatment system and all other associated site works... login required. |
Details... |
2.1km |
19/08/2020 |
CONDITIONAL |
Illaun , Miltown Malbay , Co Clare |
to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works... login required. |
Details... |
470m |
08/07/2020 |
CONDITIONAL |
Ballynew , Miltown Malbay , Co Clare |
to construct a dwellinghouse, shed, wastewater treatment system and soil polishing filter together with all ancillary site development works and services... login required. |
Details... |
1.2km |
12/09/2019 |
CONDITIONAL |
Tooreen , Miltown Malbay , Ennis |
to upgrade an existing agricultural entrance to a Forest Road Bellmouth to facilitate timber harvesting, haulage operations and associated site works to existing forestry lands... login required. |
Details... |