1.2km |
10/04/2024 |
N/A |
French's Walk, Carrignafoy, Cobh, Co. Cork |
Permission to construct a single storey domestic garage including associated siteworks.... login required. |
Details... |
1.2km |
03/04/2024 |
N/A |
No.1 Mount Eaton, Cobh, Co Cork, P24 DR53 |
Permission for: 1) To subdivide the curtilage of the existing dwelling into two separate sites, “Site A” & “Site B” 2) Construct a single storey dwelling on “Site A” to the rear of the existing dwelling and retain “Site B” for existing dwelling. 3) Associated site works.... login required. |
Details... |
2.7km |
21/03/2024 |
N/A |
Ballynacrusha, Cobh, Co.Cork, |
Permission to construct a dwelling (part single storey/part two storey) and associated site works... login required. |
Details... |
1.2km |
13/03/2024 |
N/A |
No.1 Mount Eaton, Cobh, Co. Cork, P24DR53 |
Permission for:
1. To subdivide the curtilage of the existing dwelling into two separate sites, “site A” & “site B”
2. Construct a single storey dwelling on “site A” to the rear of the existing dwelling and retain “site B” for existing dwelling.
3. Associated site works.... login required. |
Details... |
2.7km |
29/02/2024 |
N/A |
Ballynacrusha, Cobh, Co. Cork, |
Permission to construct a dwelling (part single storey/part two storey) and associated site works.... login required. |
Details... |
1.5km |
21/02/2024 |
N/A |
Ballywilliam, Cobh, Co.Cork, |
Dwelling house... login required. |
Details... |
2.5km |
16/02/2024 |
N/A |
Ashgrove Lodge, Ashgrove, Cobh, Co.Cork |
Permission for retention of the existing waste water treatment unit & percolation area serving his dwelling house & permission for amendments to his existing boundaries... login required. |
Details... |
2.5km |
15/02/2024 |
N/A |
The Coach House, Ashgrove, Cobh, Co. Cork |
Permission for amendments to the existing boundaries to his dwelling house.... login required. |
Details... |
2.2km |
19/01/2024 |
N/A |
Carrignafoy, Cobh, Co Cork, |
Permission for the construction of 98 no. residential units (comprising a mix of 94 no. 2, 3, & 4 bed detached, semi-detached and terraced houses and 4 no. 1 bed apartments. 45 no. units will have the option of a ground floor annex to the rear of the proposed dwellings) and all associated ancillary development works including the undergrounding of existing 38k... login required. |
Details... |
2.9km |
10/01/2024 |
Conditional Permission |
0.56 hectares site within ESB Aghada Generating, Station Ballincarroonig, Aghada, Co Cork P25 XE94 |
The proposed development consists of the construction of a hydrogen production facility comprising a hydrogen compound and contractor’s compound with all associated site access and ancillary site development works. The proposed development will demonstrate the full chain hydrogen production via electrolysis, storage, usage on site via fuel cell and transport offsite to other sector hydrogen users. The proposed development is to be used for hydrogen production for an operational period of up to five years. The proposed development comprises : 1) 1 megawatt (MW) electrolyser including a water purification unit (40-foot (ft) container) (2.5m x 12.2m x 5.4m) with a stack height of 7.7m above ground level, 2) A transformer and control unit container (2.8m x 7.5m x 3.3m) housing a 6.6 kilovolt (kV) to 400kV transformer, 3) A storage container (2.8m x 6.4m x 3.3m), 4) A welfare unit (2.8m x 7.5m x 3.3m), 5) A compressor (20ft container) (2.7m x 6.4m x 4.3m), 6) 5 x 2.5kg low pressure (30 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 7) 3 x 19kg high pressure (300 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 8) 2 x 61kg low pressure (30 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 9) 2 x 31kg high pressure (300 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 10) 4 x 400kg (high pressure) mobile refuelling hydrogen storage vehicles, 11) 2 x 250 kilowatt (kW) hydrogen power units (2.7m x 7.3m x 5.4m), 12) Heavy goods vehicles (HGV) loading bays with 4m high walls, 13) A palisade fe... login required. |
Details... |
2.2km |
30/11/2023 |
N/A |
Carrignafoy, Cobh, Co. Cork, |
Permission for the construction of 98 no. residential units (comprising a mix of 94 no. 2, 3 & 4 bed detached, semi-detached and terraced houses and 4 no. 1 bed apartments. 45 no. units will have an option of a ground floor annex to rear of the proposed dwellings) and all ancillary development works including the undergrounding of existing 38KV ESB lin... login required. |
Details... |
1.2km |
26/10/2023 |
Conditional Permission |
Ballydanielmore, Cobh, Co. Cork, |
Permission for the retention of extensions and alterations to existing dwelling and all associated site works.... login required. |
Details... |
1.5km |
24/10/2023 |
N/A |
No.42 Philip O'Neill's Place, Carrignafoy, Cobh, Co.Cork |
Permission for modifications to my existing dwelling house, namely; a) construction of a single storey bathroom extension to the side (east) of the existing rear single storey annex {mentio... login required. |
Details... |
2.5km |
23/10/2023 |
N/A |
'Old School Corner', Walterstown, Cobh, Co. Cork |
Applying for Retention Planning Permission for the existing concrete plinth as constructed, and planning permission for the construction of an earth bund, (900mm high), and all associated site works.... login required. |
Details... |
1.6km |
12/10/2023 |
N/A |
22 Belmont Place Carrignafoy, Cobh, Co. Cork, P24TR28 |
Permission for an extension to existing dwelling house.... login required. |
Details... |
1.6km |
21/09/2023 |
N/A |
22 Belmont Place, Cobh, Co. Cork, P24TR28 |
Planning permission for a bedroom extension to gable-end of bungalow.... login required. |
Details... |
1.7km |
06/09/2023 |
Conditional Permission |
Summerhill, Carrignafoy, Cobh, Co Cork |
Permission for the construction of a new 3 level tiered detached dwelling with road level attached garage, new site entrance and all associated site works.... login required. |
Details... |
2.9km |
17/08/2023 |
Conditional Permission |
An Riasc, Ballynacrusha, Cobh, Co Cork |
Permission to construct extension to side of dwelling (linking dwelling and existing domestic garage), change of use of existing domestic garage to living/habitable space and construct new detached domestic garage.... login required. |
Details... |
2km |
31/07/2023 |
Conditional Permission |
The Lodge , Ballybrassil, Ballymore, Cobh, Co. Cork |
Alterations to dwelling house consisting of a first floor extension, rear infill ground floor infill extension with part roofed terrace, elevational changes including roof over entrance and all associated site works.... login required. |
Details... |
1.9km |
10/05/2023 |
Conditional Permission |
85 The Spires, Carrignafoy, Cobh, Co Cork |
1) Permission for modifications to our existing dwelling house, namely: A) Construction of a single storey porch extension to the front elevation, B) Insert 1 No. ground floor window to side (East) elevation and C) Alterations to exiting ground floor wi... login required. |
Details... |