Skip to main content
All plans now 50% off - Limited offer for Business and Individual Subscriber accounts. Discount expires on Saturday, 30 March 2024.

  Grange Castle Business Park South, Townland of Milltown and bounding the Grange Castle South Access Road to the North, Baldonnel, Dublin 22

Sep 24 2019

Application Received

Nov 18 2019

Decision Due

Nov 18 2019

Decision

Jan 09 2020

Withdrawn
  • Submitted to South Dublin County Council, 24 / 09 / 2019
  • Application Type: Permission
  • Current Status: Officer Allocation
  • Decision Text: GRANT PERMISSION
  • Decision Summary: Granted
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
Single storey ESB substation (27sq.m) that will be accessed from the north off the Grange Castle South Access Road via the Baldonnel Road and off the permitted internal road granted under Reg. Ref. SD18A/0134, An Bord Pleanála Ref. ABP-302813-18 to the south; the proposal will result in a minor and temporary amendment to the landscaping... Signup to read full development description
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    2.1km 11/05/2022 N/A Block C, Kingswood Business Park, Dublin 22 Retention of 3 storage units, valeting bays with car parking, car storage area and all associated site works.... login required. Details...
    2.8km 06/05/2022 N/A In the townlands of Gollierstown & Aderrig, Adamstown, Lucan, Co. Dublin Comprising Phase 1 of the Adamstown Boulevard Development Area and consists of 38,768.21sq.m. of residential development to be constructed in a mix of housing and apartment units, with 423 residential units proposed in total (of which 166 units are subject to the application for outline permission); The housing units for which permission is being sought are on a site of 9.22Ha shall comprise 75 two bedroom units, 113 three bedroom units and 69 four bedroom units, ranging from 2 to 3 storeys in height; Outline permission is sought on a site of 0.54Ha for the apartment block, which shall range from 5 to 9 storeys in height and comprises 11 studio units, 76 one bedroom units and 79 two bedroom units; All residential units are provided with private open space, in the form of private rear gardens or balconies; The proposed development includes approximately 0.95 Ha of public open space in the form of a linear open space located on the east of the site stretching between Adamstown Way and Station Road and a pocket park located in the north-west of the site. 488 car parking spaces are proposed in total. 433 of these are allocated to the housing element of the development, and 55 are allocated to the apartments. A total of 52 visitor spaces are provided across the site; A total of 6 disabled spaces and 6 EV spaces are proposed. 40 secure bicycle parking spaces are provided in 4 locations throughout the site. 3 ESB Substations... login required. Details...
    2.7km 27/04/2022 N/A Site at the townland of Collegeland, Baldonnell Business Park, Dublin 22 2 halo illuminated signs to the southern and northern elevations of Unit D and all associated works.... login required. Details...
    1.4km 14/04/2022 N/A Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin Amendments to the electrical substation compound and structures permitted under Reg. Ref. SD19A/0042 and ABP Ref. 305948-19 comprising of amendment to the layout and extent of the permitted substation compound, to include an extension of the compound area to c. 0.77 hectares; reorientation of the Gas Insulated Switchgear (GIS) substation building to a north­south orientation, and associated amendments to the building footprint, layout, and elevations, providing for a two storey building with a gross floor area (GFA) of c. 1,456 sq.m; alterations to the permitted single storey C... login required. Details...
    2.6km 14/04/2022 N/A In the townland of Gollierstown, Adamstown, Lucan, Co. Dublin Phase Three of the Adamstown District Centre and consists of 37,402sq.m (gross floor area including car parking and storage) of residential development to be constructed in 3 blocks ranging in height from 2 to 9 storeys; There is a total of 436 apartments, comprising 9 studio apartments, 204 one bedroom apartments, 213 two bedroom apartments and 10 three bedroom apartment; An ancillary resident's pavilion building (2 storey) is linked to Block D, ancillary resident's amenity rooms and facilities are also provided at ground floor level of Block A; All apartments are provided with private open space in the form of balconies or gardens; The proposed block description is as follows: Block A (c. 11,821sq.m gross floor area): 4 - 5 storeys in height, with a total of 143 apartments (70 one bedroom apartments, 67 two bedroom 4 person apartments and Gno. 3-bedroom apartments); A resident's only podium level, courtyard is provided within Block A; Ancillary plant, storage, waste, and internal bicycle parking rooms provided at ground floor level; Block C (c. 9,680sq.m gross floor area): 4 - 9 storeys in height, with a total of 124 apartments {60 one bedroom apartments, 5 two bedroom 3 person apartments, 55... login required. Details...
    2.3km 07/04/2022 N/A 518B, Grants Crescent, Greenogue Business Park, Rathcoole, Co. Dublin Retention of existing building (159.25) currently not in use. Proposed use is intended as a recycling facility and this will be subject to a separate application.... login required. Details...
    870m 24/03/2022 SEEK CLARIFICATION OF ADDITIONAL INFO. Profile Park, Nangor Road, Clondalkin, Dublin 22 10 year permission for development consisting of removal of an existing unused waste water treatment facility on site and the erection of two data centre buildings, gas powered energy generation compound, and all other associated ancillary buildings and works; the two data centre buildings, DUB 15 and DUB 16, will comprise a total floor area of c. 33,577sq.m over two storeys; the first 2 storey data centre building (DUB15), located to the southwest of the site, will comprise 16,865sq.m data storage use, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; a second 2 storey data centre building (DUB16), located to the southeast of the site, will comprise 16,712sq.m data storage areas, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; both data centre buildings will reach a height of 20m; emergency genera... login required. Details...
    2.4km 21/03/2022 REQUEST ADDITIONAL INFORMATION Kingswood Farm, Moneenalion Commons Lower, Clondalkin, Dublin 22 Relocation of the existing Clondalkin RFC grounds at Gordon Park to new lands at Kingswood Farm, Moneenalion Commons Lower Clondalkin and comprising of 4 new rugby playing pitches, including a high quality main competition pitch (with modern directional floodlighting comprising 18m high floodlighting columns either side) and a high quality Junior pitch both laid approximately level, and two back pitches as well as various grassed rugby training areas all laid on existing land cross fall levels; change of use of existing agricultural shed to accommodate new two storey changing facility and storage areas; a new two st... login required. Details...
    560m 21/03/2022 GRANT PERMISSION In the townlands of Ballybane & Kilbride within Profile Park, Clondalkin, Dublin 22 Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch... login required. Details...
    710m 11/03/2022 SEEK CLARIFICATION OF ADDITIONAL INFO. Profile Park, Baldonnel, Dublin 22 Construction of a gas fired power plant with an electrical output of up to 125MW with associated balance of plant, equipment and buildings including; an Engine Hall building with a height of 18.9m, comprising 6 gas engines and ancillary infrastructure; an Electrical Annex Building with a height of 18.7m; a Workshop building with a height of 5. 1m; a Tank Farm building with a height of 5.68m; a Security hut with a height of 3.27m; an Exhaust Stack with a height of 31.8m; a Gas AGI including a kiosk with height of 3.3m; Radiator Coolers with a height of 8.46m; 2 electrical transformers with a height of ... login required. Details...
    2.9km 01/03/2022 GRANT PERMISSION Brownsbarn, Citywest Campus, Dublin 24. Construction of 2 warehouses with ancillary office and staff facilities and associated development; Unit 1 will have a maximum height of 16.35 metres with a gross floor area of 8,156sq.m including a warehouse area (7,397sq.m), ancillary office areas (362sq.m) and staff facilities (397sq.m); Unit 2 will have a maximum height of 15.35 metres with a gross floor area of 5,990sq.m including a warehouse area (5,031sq.m), ancillary office areas (536sq.m) and staff facilities (423sq.m); vehicular access/egress routes to the subject site via the existing roundabout and access road; alteration to the existing access arrangem... login required. Details...
    2.7km 01/03/2022 GRANT PERMISSION 6, Stratton Square, Adamstown, Lucan, Co. Dublin Pitched roof first floor extension to rear and all associated site works.... login required. Details...
    920m 25/02/2022 GRANT PERMISSION Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22 Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and p... login required. Details...
    2.4km 25/02/2022 INVALID APPLICATION Kingswood Farm, Moneenalion Commons Lower, Clondalkin, Dublin 22 Relocation of the existing Clondalkin RFC grounds at Gordon Park to new lands at Kingswood Farm, Moneenalion Commons Lower Clondalkin and comprising: 4 new rugby playing pitches, including a high quality main competition pitch (with modern directional floodlighting comprising 18m high floodlighting columns either side) and a high quality Junior pitch both laid approximately level, and two back pitches as well as various grassed rugby training areas all laid on existing land cross falls levels; change of use of existing agricultural shed to accommodate new two storey changing facility and storage areas; a new two storey C... login required. Details...
    290m 25/02/2022 DECLARED NOT EXEMPT Townlands of Aungierstown & Ballybane, lying at the entrance of the existing facility in, Newcastle, Clondalkin, Dublin 22. Entrance upgrade comprising: (1) 3 heavy duty barriers & controls with 3 new smaller traffic arms and 3 road blockers; (2) Upgrade includes removal of existing island and construction of a smaller central island in a new position and all ancillary works in relation to the upgrade.... login required. Details...
    2.4km 08/02/2022 GRANT PERMISSION Townlands of Gollierstown, Adamstown, Lucan, Co. Dublin Minor amendments to the development permitted under Planning Permission Ref SDZ21A/0007 comprising the following: repositioning of landscaped communal courtyard of Block G from first floor podium level to ground floor level due to removal of podium parking at Level 0, and the consequential relocation of 83 car parking spaces within the Block F multi-storey car park (as permitted under Ref SDZ20A/0008, amended by SDZ20A/0018 and as further amended under a concurrent application under Ref SDZ21A/0017) and to on-street locations immediately adjacent to Block G, all including ancillary site development and landscape works; modification of 174 apartments (74 one-bedroom units, 98 two-bedroom units and 2 three-bedroom units) arising from adjustments to structural grids in Block G consequent to repositioning of the car parking and the landscaped courtyard; adjustments to Block G2 consisting of a minor reduction to the footprint of the Block by 0.6m and the removal of the setback floor on the nor... login required. Details...
    860m 03/02/2022 REFUSE PERMISSION Kilcarberry Business Park, Nangor Road, Clondalkin, Dublin 22 Widening of the site entrance to provide for a separate lane for the entrance and exit of cars to separate car traffic from heavy good vehicle traffic and associated works at Kilcarberry Business Park, Clondalkin, Dublin 22.... login required. Details...
    2.9km 01/02/2022 GRANT PERMISSION Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22 Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.... login required. Details...
    2km 01/02/2022 GRANT PERMISSION Kingswood Business Park, Baldonnel, Dublin 22. Alterations to an existing granted planning application (previously granted permissions Reg. Ref. SD18A/0314 [ABP-304148-19], SD19A/0408, SD20A/0187); reconfiguration of the ground floor area consisting of a new ancillary storage area to the proposed building's eastern elevation measuring 75sq.m, at mezzanine level; change of use of 57sq.m of warehouse floor area to staff facilities due to the following, addition of single storey fire protected corridor from Office A to in the south-west corner of the warehouse, overall 45sq.m floor area addition; addition of stairs from warehouse to mezzanine level, overall 12sq.m floor area addition; elevation alterations, introduction of covered glazed structure at the main Office entrance to the front (southern) elevation, overall height 6.18m; introduction of Integrated Modular Louvre System to Charging Area to the front (southern) and side (eastern) elevation; change of colour of southern ... login required. Details...
    1.3km 31/01/2022 GRANT PERMISSION Takeda Ireland Limited, Grange Castle Business Park, Clondalkin, Dublin 22 Retention and continuance of the use for a further two years of the temporary gas powered generation plant, that is located to the rear of the Takeda Ireland complex, that is sited within a walled year of 2,836sq.m containing 12 generator units with associated flues (each 15m high), which was permitted initially for a period of three years ... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Ll
    • Description: Locally Important Aquifer - Bedrock which is Moderately Productive only in Local Zones

    Vulnerability:
    • Unit Name: Lucan Formation
    • Description: Dark limestone & shale (`calp)
    • Labels: CDLUCN / LU

    Bedrock:
    • Extreme ( E)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    No Results...

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • No Results...

Return to top...