  Gortnagross , Athea , Co. Limerick.

Sep 18 2019

Application Received

Nov 08 2019

Decision

Nov 12 2019

Decision Due
  • Submitted to Limerick County Council, 18 / 09 / 2019
  • Application Type: PERMISSION
  • Current Status: APPLICATION FINALISED
  • Decision Text: REFUSED
  • Decision Summary: Refused
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
a dwelling house, detached domestic garage, new entrance with ... Signup to read full development description
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    520m 31/03/2022 N/A Dalton Street , Athea , Co. Limerick for the conversion of an existing house to 2no townhouses... login required. Details...
    90m 02/03/2022 CONDITIONAL Gortnagross , Athea , Co. Limerick (a) the demolition of an existing single storey attached garage, (b) construct extensions to side and rear of existing dwelling house with elevational changes, connection to existing services with all associated site works... login required. Details...
    2.2km 17/02/2022 CONDITIONAL Athea Lower , Athea , Co. Limerick (a) existing front bay window extension to existing dwelling house, (b) 2 no. domestic sheds along with all associated works... login required. Details...
    750m 25/01/2022 CONDITIONAL Templeathea West , Athea , Co. Limerick extension of existing cattle shed and construction of a two bay easy feed slatted unit and all ancillary works... login required. Details...
    2.3km 08/12/2021 CONDITIONAL Kilathmoy Wind Farm Athea Upper , Athea , Co. Limerick. an extension of the existing battery energy storage system (BESS) at Kilathmoy Wind Farm substation. The proposed development will consist of the following components; Lithium-ion battery containers including ancillary HVAC equipment; Power Conversion System (PCS)/Inverter units; Transformer units; Connection to the existing on site Grid Transformer, Pr... login required. Details...
    2km 07/12/2021 CONDITIONAL Templeathea West , Athea , Co. Limerick the existing domestic shed as presently constructed with all associated works... login required. Details...
    2.8km 29/11/2021 CONDITIONAL Coole West , Athea , Co. Limerick (A) the demolition of existing derelict house (B) the construction a single storey dwelling house, detached domestic garage, upgrade existing entrance and entrance walls, install a mechanical aeration unit and polishing filter system with all associated site works... login required. Details...
    2.4km 22/09/2021 CONDITIONAL Athea Upper , Athea , Co. Limerick construction of a single storey dwelling house, detached domestic garage, front boundary entrance walls, mechanical aeration unit with polishing filter system with all associated site works... login required. Details...
    1.1km 21/09/2021 CONDITIONAL Gortnagross , Athea , Co. Limerick construction of a new single storey dwelling house with detached domestic garage, front boundary entrance walls, mechanical aeration unit with polishing filter system and all associated site works... login required. Details...
    470m 18/08/2021 CONDITIONAL Gortnagross , Athea , Limerick demolition of detached domestic sheds, breaking out new window ope side(west) elevation, construction of single storey extension to side (west) and rear, construction of detached domestic garage to side(west) and all ancillary site works ... login required. Details...
    580m 03/08/2021 CONDITIONAL Templeathea West , Athea , Limerick construction of a single storey extension to the west of the existing sports hall. The extension will contain two meeting rooms and reception ... login required. Details...
    1.2km 30/07/2021 CONDITIONAL Templeathea West , Athea , Co. Limerick construction of a new milking complex & collecting/holding yard. Proposed milking complex to incorporate dairy, plant room, ancillary room and drafting area. Collecting/holding y... login required. Details...
    2.6km 07/07/2021 CONDITIONAL Direen , Athea , Co. Limerick construction of a two storey dwelling house, detached domestic garage, front boundary entrance walls, installation of a mechanical aeration unit with polishing filter system and all associated site works... login required. Details...
    1.2km 14/06/2021 CONDITIONAL Athea Lower , Athea , Co. Limerick change of house design from that previously granted under planning reference 18/1175... login required. Details...
    2.9km 21/05/2021 CONDITIONAL Derreen , Athea , Co. Limerick agricultural entrance... login required. Details...
    2.9km 21/05/2021 CONDITIONAL Derreen , Athea , Co. Limerick revised site boundaries... login required. Details...
    1.5km 07/05/2021 CONDITIONAL Templeathea West , Athea , Co. Limerick domestic garage, domestic shed for storage of turf, tractor and trailer, general storage and donkey, entrance from public road to domestic shed... login required. Details...
    780m 01/04/2021 CONDITIONAL Athea Upper , Athea , Co. Limerick change of use of former funeral home to residential uses, carry out modifications to external elevations, undertake all existing site works with existing connection to all public utility services... login required. Details...
    120m 30/03/2021 CONDITIONAL Gortnagross , Athea , Co. Limerick extension of duration for 15/993 for the construction of a storey and a half dwelling house, domestic garage, front entrance with a pumped connection to public sewer and all ancillary site works... login required. Details...
    470m 18/03/2021 CONDITIONAL 8 Daltons Terrace , Barrack Street , Athea Co. Limerick removal of roadside boundary wall to provide off road parking... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Ll
    • Description: Locally Important Aquifer - Bedrock which is Moderately Productive only in Local Zones

    Vulnerability:
    • Unit Name: Central Clare Group
    • Description: Sandstone, siltstone & mudstone
    • Labels: CNCCG / CCG

    Bedrock:
    • Moderate ( M)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
    • No Results...

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    No Results...

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • No Results...

Return to top...