1.9km |
10/11/2021 |
Conditional |
BALLINA ROAD, KNOCKALEGAN, CROSSMOLINA, CO. MAYO |
RETENTION OF ALTERATIONS TO ELEVATIONS, INCLUDING ADDITIONAL WINDOWS ADN DOORS, OF EXISTING COMMERCIAL BUILDING... login required. |
Details... |
2.6km |
07/10/2021 |
Conditional |
CARROWCRIN, CROSSMOLINA, CO MAYO |
CONSTRUCTION OF 1 NO. STANDALONE BUILDING INCORPORATING GYM, MEETING ROOM AND STORAGE AREA. INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES... login required. |
Details... |
1.9km |
06/09/2021 |
n/a |
BALLINA ROAD, KNOCKALEGAN, CROSSMOLINA |
RETENTION OF ALTERATIONS TO ELEVATIONS, INCLUDING ADDITIONAL WINDOWS AND DOORS, OF EXISTING COMMERCIAL BUILDING... login required. |
Details... |
2.7km |
19/08/2021 |
Conditional |
MULLENMORE NORTH , CROSSMOLINA |
DEMOLISH EXISTING EXTENSION TO REAR OF DWELLING, CONSTRUCT NEW EXTENSION TO DWELLING, UPGRADE AND RELOCATE EXISTING SEPTIC TANK SYSTEM, CONSTRUCT NEW DOMESTIC GARAGE AND CARRY OUT ALL REQUIRED ANCILLARY WORKS ON SITE... login required. |
Details... |
1.6km |
22/07/2021 |
Conditional |
GRANGE , CROSSMOLINA, CO. MAYO |
CONSTRUCTION OF 1 NO. DWELLING HOUSE, DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM WITH SOIL POLISHING FILTER INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICES... login required. |
Details... |
1.4km |
28/06/2021 |
n/a |
GRANGE, CROSSMOLINA, CO. MAYO |
CONSTRUCTION OF A PROPOSED NEW DETACHED DWELLING HOUSE, SEPARATE GARAGE, NEW ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES AND ALL ASSOCIATED SITE WORKS AND LANDSCAPING... login required. |
Details... |
1.7km |
10/06/2021 |
Conditional |
CARROWGARVE NORTH, CROSSMOLINA |
CONSTRUCTION OF 1 NO. DWELLING HOUSE AND WASTEWATER TREATMENT SYSTEM WITH SOIL POLISHING FILTER, INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES... login required. |
Details... |
2km |
21/05/2021 |
n/a |
GORTNARABY, CROSSMOLINA, BALLINA , CO MAYO |
1. AQUA WATER PARK PLAY AREA ON THE EXISTING LAKE TO INCLUDE PONTOON/WALKWAY, INFLATABLE WATER SLIDES, INFLATABLE PLATFORMS, INFLATABLE LOGS AND CLIMBING FRAMES. 2. PREFABRICATED MOBILE CHANGING... login required. |
Details... |
2.2km |
29/04/2021 |
Conditional |
TOOREEN , CROSSMOLINA, CO. MAYO |
CONSTRUCTION OF 1 NO. DWELLING HOUSE AND GARAGE WITH WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER, INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICES... login required. |
Details... |
2.3km |
23/04/2021 |
Conditional |
DEELCASTLE, CROSSMOLINA |
CONSTRUCT NEW DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA, DETACHED GARAGE INCLUDING ALL ANCILLARY SITE WORKS... login required. |
Details... |
2km |
04/02/2021 |
Refused |
CARROWGARVE, CROSSMOLINA |
CONSTRUCTION OF DWELLING HOUSE AND WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICES... login required. |
Details... |
1.5km |
18/12/2019 |
REFUSED |
GORTNARABY , CROSSMOLINA , BALLINA |
CONSTRUCT DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICES... login required. |
Details... |
1.6km |
14/11/2019 |
N/A |
BALLINA ROAD , CROSSMOLINA |
RESIDENTIAL DEVELOPMENT CONSISTING OF 20 NUMBER DWELLING HOUSES WITH CONNECTION TO PUBLIC SERVICES AND ASSOCIATED SITE WORKS... login required. |
Details... |
1.1km |
17/10/2019 |
CONDITIONAL |
GORTSKEDDIA , CROSSMOLINA |
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, CONNECT TO PUBLIC UTILITIES INCLUDING SEWER AND TO CARRY OUT ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.4km |
24/07/2019 |
CONDITIONAL |
KNOCKAGARRAVAUN , CROSSMOLINA |
CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE, TOGETHER WITH PROPRIETARY TREATMENT UNIT AND PERCOLATION AREA AND ALL OTHER ANCILLARY SITE WORKS... login required. |
Details... |
2.4km |
06/06/2019 |
REFUSED |
FOTISH , CROSSMOLINA , BALLINA |
CONSTRUCT DWELLING HOUSE AND WASTEWATER TREATMENT SYSTEM WITH SOIL POLISHING FILTER, INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICES... login required. |
Details... |
1.6km |
18/04/2019 |
CONDITIONAL |
Grange , Crossmolina , Co Mayo |
(1) Demolish existing storage building; (2)Construction of a storage shed, roofed manure pit and 4 bay enclosed slatted shed with a creep area and underground slurry storage tank along with all associated site works... login required. |
Details... |
1.5km |
28/02/2019 |
CONDITIONAL |
KNOCKALEGAN TD. , CROSSMOLINA |
CONSTRUCTION OF A NEW DETACHED DWELLING HOUSE AND DOMESTIC SHED TOGETHER WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |