2km |
20/04/2022 |
N/A |
Finnis, Mishells, Bandon, Co. Cork |
2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning Reference 176111) to the existing Bandon Substation an... login required. |
Details... |
2km |
28/03/2022 |
N/A |
Kilbrogan, Bandon, Co.Cork, |
Planning permission for the construction of a ground floor extension and modifications to existing dwelling including new windows to rear and side elevation and all associated site work... login required. |
Details... |
1.9km |
25/03/2022 |
N/A |
No. 20 Oliver Plunkett Street, Cloghmacsimon, Bandon, Co. Cork |
Permission for retention of one-bed apartment on the first floor and a two-bed apartment on the second floor (all for long-term letting).... login required. |
Details... |
70m |
24/02/2022 |
N/A |
Kilbeg House, Kilbeg North, Kilbeg South Bandon, Co Cork |
Partial demolition of existing shed and construction of new granny flat, material alterations and refurbishment of the existing horse stables to new stables and storage areas, upgrading of the existing septic tank to a new bio filtration unit and all associated site works.... login required. |
Details... |
1.4km |
16/02/2022 |
N/A |
Kilpatrick, Bandon, Co.Cork, |
1. Demolition of existing agricultural building to include machinery & general store, cubicle, slatted and straw bedded livestock housing, 2. Construction of 2 no. agricultural buildings for storage of agricultural machinery & dry goods, straw and f... login required. |
Details... |
1.6km |
11/02/2022 |
N/A |
Clogheenavodig, Spring lane, Bandon, Co.Cork |
The construction of a mixed-use business park comprising office, light industry and warehousing uses and all associated site development works. The proposed development makes provision for a 637sqm office building (block 1) over two storeys, 515sqm of light industrial space (block 2) over 3 no single storey units, and 1073 sqm of warehousing space (block 3) over 5 no. single storey units. the proposed development will be accessed from a new vehicular as well as... login required. |
Details... |
2km |
11/02/2022 |
Conditional Permission |
Hahnel Industries , Parnell Business Centre Parnell Street, Cloghmacsimon Bandon, Co Cork |
The subdivision of existing 2 storey office building as granted under Pl.Ref.No.05/7056 to provide 1 no. office suite at first floor and 1 no. office at ground floor to be used by independent entities with ... login required. |
Details... |
1.2km |
05/11/2021 |
N/A |
Bandon Mart, Mill Road, Clogheenavodig, Bandon, Co. Cork |
The development will consist of an 18 metres monopole carrying antennas, a dish, associated equipment, together with ground-based equipment cabinets, fence and all associated site development works for wireless data and broadband services. ... login required. |
Details... |
2.2km |
28/10/2021 |
Conditional Permission |
Ballymountain South, Innishannon, Co. Cork, |
Alterations to existing dwelling house including (1) the conversion of existing garage and utility room to bedroom and en-suite bathroom (2) the conversion of existing bedroom to utility room and (3) elevation alterations and new pitched roof over proposed bedroom and en-suite bathroom.... login required. |
Details... |
1.6km |
24/09/2021 |
Refused |
Watergate Street, Knockbrogan, Bandon, Co. Cork |
The construction of a residential development of 28 no. apartments, comprising 15 no. 2 bedroom and 13 no. 1 bedroom units, contained in three 2-4 storey buildings and all ancillary site works. The proposed development consists of: (1) the demolition of the single storey over basement extension to the existing industrial ‘Brewery’ building fronting onto Watergate Street and the demolition of existing two storey extensions, boiler house, portacabin, storage container and ancillary structures to the rear; (2) the change of use, partial demolition and refurbishment of the existing industrial ‘Brewery’ building (Block A) and the construction of replacement of three storey extension fronting ... login required. |
Details... |
780m |
01/09/2021 |
Conditional Permission |
Kilbrogan, Bandon, Co. Cork, |
The installation of a waste water treatment unit and associated peat filter system and soil polishing filter and all ancillary works... login required. |
Details... |
700m |
03/08/2021 |
Conditional Permission |
Main Cork Road, Ballylangley, Bandon, Co. Cork |
Construction of extended car parking adjacent to existing drive through restaurant incorporating 32 no. car spaces with access from existing car park.... login required. |
Details... |
2.1km |
14/07/2021 |
Conditional Permission |
Littlesilver, Bandon, Co. Cork, |
A horticultural enterprise for the production and processing of cut flowers and flower bulbs and will involve the construction of an operations building (1632.41 sq. m), photovoltaic panels (320.00 sq. m), hardstanding a... login required. |
Details... |
1.5km |
02/07/2021 |
Conditional Permission |
Cork Road, Knockbrogan, Bandon, Co. Cork |
The construction of a single storey extension to the rear of existing dormer dwelling and all associated site works.... login required. |
Details... |
1.4km |
21/06/2021 |
Conditional Permission |
Kilpatrick, Bandon, Co. Cork, |
Alterations and extensions to dwelling house including (A) to demolish existing flat roof extension, (B) to construct ground floor extension and first floor extension, (C) to install new sewerage treatment system and decommission existing septic tank and all associated site works.... login required. |
Details... |
1.4km |
15/06/2021 |
Unconditional Permission |
Distillery Road, Clogheenavodig, Bandon, Co. Cork |
Construction of 2 no. two storey semi-detached dwelling houses and all associated ancillary works - Extension of duration of permission granted under planning reference: 16/4550.... login required. |
Details... |
1.8km |
10/06/2021 |
N/A |
4 Ardan Na N-Oglach, Cloghmacsimon, Bandon, Co. Cork |
The construction of new lean to roof to existing outbuilding on eastern gable elevation of dwelling house, together with all other ancillary site works. ... login required. |
Details... |
770m |
09/06/2021 |
Conditional Permission |
Kilbrogan, Bandon, Co. Cork, |
Construction of extension to vehicle repair workshop and all associated site works. ... login required. |
Details... |
1.9km |
03/06/2021 |
Conditional Permission |
Clashafree, Bandon, Co. Cork, |
The construction of new dwelling house and all associated site works. ... login required. |
Details... |
1.6km |
03/06/2021 |
Conditional Permission |
Clashafree, Bandon, Co. Cork, |
The construction of extensions and alterations to an existing dwellinghouse, the installation of a new septic tank with a percolation area, the demolition of an outbuilding, the construction of a new vehicular entrance, and all associated site works.... login required. |
Details... |