3km |
22/02/2022 |
N/A |
Ballyea South , Ballina , Co. Tipperary |
to erect a dwellinghouse and garage , entrance, install an effluent treatment system and percolation area and carry out associated site works at above address... login required. |
Details... |
2km |
04/02/2022 |
CONDITIONAL |
Birdhill Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary |
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance ... login required. |
Details... |
2km |
28/01/2022 |
N/A |
Birdhill Service Area , Junction 7 (M7) , Lackanavea Birdhill Co. Tipperary |
the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works 1) the fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces, 2) the compressed natural gas compound is a single storey development consisting of a compressor building (19 sq.m), covered shelter (29 sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance ... login required. |
Details... |
1.9km |
26/01/2022 |
N/A |
Unit 4 Shannonside Business Park , Birdhill , Co. Tipperary |
previous administration and distribution facility consisting of partial change of use of ground floor level and extension of first floor level to provide additional offices, meeting rooms and laboratories, new access doors to t... login required. |
Details... |
2km |
20/01/2022 |
N/A |
Birdhill Service Area , Junction 7 (M7) , Lackanavea |
of the upgrade of an existing off-line motorway service area in order to provide a fast charge electric vehicle hub, compressed natural gas compound and dispenser, drive-thru coffee facility, new signage and all associated site works. (1.) The fast-charge electric vehicle hub involves the conversion of 14 no. existing car park spaces into fast-charging electric vehicle spaces. (2.) The compressed natural gas compound is a single storey development consisting of a compressor building (19sq.m), covered shelter (29sq.m), cooler, 3m high lighting column and associated ground works all contained with 65m of 2.4m high palisade fence with pedestrian and vehicular entrance p... login required. |
Details... |
1.9km |
20/01/2022 |
N/A |
Unit 4 Shannonside Business Park , Birdhill , Co Tipperary |
partial change of use of ground floor level and extension of first floor level to provide additional offices, meeting rooms and laboratories, new access doors to the rear and side elevations, new... login required. |
Details... |
1.9km |
02/12/2021 |
CONDITIONAL |
Inchadrinagh , Ballina , Co Tipperary |
a dwelling house with domestic car garage, proprietary wastewater treatment system and polishing filter, entrance to site, together with associated site works... login required. |
Details... |
2.5km |
01/12/2021 |
CONDITIONAL |
Boher , Ballina , Co Tipperary |
construction of a single storey dwelling house with detached domestic garage, front boundary entrance walls, installation of a mechanical aeration system with polishing filter system and all associated site works... login required. |
Details... |
1.9km |
22/11/2021 |
N/A |
Inchadrinagh , Ballina , Co Tipperary |
a dwelling house with garage adjacent at north side of proposed house, proprietary wastewater treatment system, entrance and boundary treatment, together with associated siteworks... login required. |
Details... |
2.9km |
19/11/2021 |
CONDITIONAL |
Ballyea South , Ballina , Co. Tipperary |
construction of a dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works... login required. |
Details... |
1.9km |
22/10/2021 |
N/A |
Inchadrinagh , Ballina , Co. Tipperary |
dwelling house with garage adjacent at north side of proposed house, proprietary waste water treatment system, entrance and boundary treatment together with associated site works... login required. |
Details... |
2.9km |
06/09/2021 |
CONDITIONAL |
Former Creamery , Birdhill , Co Tipperary |
tourism visitor facility to incorporate exhibition space, associated retail, cafe and visitor services facilities, admin areas, independent office space and associated site works to incorporate children's play area, viewing platform, golf pu... login required. |
Details... |
2.1km |
27/08/2021 |
N/A |
Gortybrigane , Birdhill , Co Tipperary |
construct a traditional style single storey dwelling house, onsite wastewater treatment system and site entrance, together with associated siteworks ... login required. |
Details... |
2.8km |
18/06/2021 |
CONDITIONAL |
Station Road , Birdhill , Co. Tipperary |
to erect a dwellinghouse, entrance, install an effluent treatment system and percolation area and associated site works ... login required. |
Details... |
2.6km |
11/06/2021 |
N/A |
The Old Barracks , Birdhill , Co. Tipperary |
kitchen and store which are used as part of existing old barracks coffee bar, retention of garden seating area, permission for cycle and motorcycle parking spaces, accessi... login required. |
Details... |
2.6km |
10/06/2021 |
N/A |
The Old Barracks , Birdhill , Co. Tipperary |
kitchen and store which are used as part of existing old barracks coffee bar, retention of garden seating area, permission sought for cycle and motorcycle parking spaces, accessi... login required. |
Details... |
2.8km |
10/06/2021 |
N/A |
Station Road , Birdhill , Co. Tipperary |
to erect a dwellinghouse, entrance, install an effluent treatment system and percolation area and associated site works ... login required. |
Details... |
1.9km |
25/05/2021 |
CONDITIONAL |
Unit 3 , Shannonside Business Park , Birdhill |
development of existing administration and distribution facility operated by rehabilitation equipment provider Lyncare Ltd. comprising (i) partial change of use of ground floor level and extension of first floor level to provide rehabilitation centre (459sq.m) with direct links to existing warehousing and office accomodation (ii) provision of new external courtyard (4... login required. |
Details... |
1.9km |
17/05/2021 |
N/A |
Unit 3 Shannonside Business Park , Birdhill , Co. Tipperary |
development at existing administration and distribution facility operated by rehabilitation equipment provider Lyncare Ltd comprising (i) partial change of use of ground floor level and extension of first floor level to provide rehabilitation centre (459sq.m) with direct links to existing warehousing and office accomodation (ii) provision of new external courtyard (4... login required. |
Details... |
2.1km |
12/05/2021 |
CONDITIONAL |
Four Roads , Kilmastulla , Birdhill Co. Tipperary |
construction of private dwelling house and semi detached garage, entrance from the public road, waste water treatment system and ancillary site development works... login required. |
Details... |