2.6km |
10/05/2022 |
N/A |
Annaholty , Birdhill , Co Tipperary |
an industrial storage shed, a concrete batching plant canopy, a steel cement storage silo, three concrete aggregate storage bays, two office portacabins, an extension to a truck maintenance shed, three steel storage containers and a canteen/toilet adjacent to the truck maintenance shed, a truck wash bay and a self contained purpose built fuel dispensing unit. Also for full planning permission to construct a new free standing steel canopy ad... login required. |
Details... |
1.8km |
06/05/2022 |
N/A |
Shower , Newport , Co. Tipperary |
ground floor extension, second floor attic development and window variations at ground and rear first floor levels of existing dwelling house... login required. |
Details... |
2.1km |
23/03/2022 |
N/A |
Cooleen , Birdhill , Co Tipperary |
storage shed and covered lean-to to the southern side of existing dwelling... login required. |
Details... |
2.5km |
25/02/2022 |
CONDITIONAL |
Gortshane Middle , Newport , Co Tipperary |
an extension to farmyard consisting of a cattle shed with underground slurry storage tank... login required. |
Details... |
2.8km |
24/02/2022 |
N/A |
lands adjacent to Bloomfield House , Foxhall , Newport Co.Tipperary |
the relocation of existing vehicular entrance, new 2 storey 4 bedroom detached dwelling house, car port, waste water treatment system, soil polishing filter and associated site works including renovation of walled garden previously part of Bloomfield House which is a protected structure... login required. |
Details... |
2.8km |
21/02/2022 |
N/A |
lands adjacent to Bloomfield House , Foxhall , Newport Co.Tipperary |
The relocation of existing vehicular entrance, new 2 storey 4 bedroom detached dwelling house, car port, waste water treatment system, soil polishing filter and associated site works including renovation of walled garden previously part of Bloomfield House which is a protected structure... login required. |
Details... |
2.8km |
05/11/2021 |
CONDITIONAL |
Cooleen , Birdhill , Co. Tipperary |
construction of (a) part single storey, part two storey dwelling house measuring 240 sq m, (b) single storey domestic garage measuring 47 sq m, (c) new boundary wall and vehicular entrance to public road, (d) wastewater treatment and all associated site services and works... login required. |
Details... |
2.8km |
03/11/2021 |
N/A |
Cooleen , Birdhill , Co. Tipperary |
construction of (a) part single storey, part two storey dwelling house measuring 240 sq m, (b) single storey domestic garage measuring 47 sq m, (c) new boundary wall and vehicular entrance to public road, (d) wastewater treatment and all associated site services and works... login required. |
Details... |
2.7km |
20/10/2021 |
CONDITIONAL |
Cooleen , Birdhill , Co. Tipperary |
new two storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
2.3km |
15/09/2021 |
CONDITIONAL |
Cooleen , Birdhill , Co. Tipperary |
septic tank, a pump chamber, a raised percolation area and other associated site works... login required. |
Details... |
2.7km |
20/08/2021 |
CONDITIONAL |
Rockvale , Newport , Co. Tipperary |
construction of a new dwelling, garage, wastewater treatment system, polishing filter, entrance and all associated site works... login required. |
Details... |
2.3km |
12/08/2021 |
N/A |
Cooleen , Birdhill , Co. Tipperary |
septic tank, a pump chamber, a raised percolation area and other associated site works... login required. |
Details... |
2km |
11/06/2021 |
CONDITIONAL |
Freagh , Newport , Co. Tipperary |
the construction of an entrance, dwelling house, garage, septic tank and percolation area together with all associated site works... login required. |
Details... |
2.7km |
27/05/2021 |
CONDITIONAL |
Thornhill , Birdhill , Co. Tipperary |
revised site boundaries and revised dwelling location from that granted under planning reference no. 21151 for a new single storey dwelling house complete with an effluent treatment system... login required. |
Details... |
2.8km |
11/02/2021 |
CONDITIONAL |
Thornhill , Birdhill , Co. Tipperary |
a single storey dwelling house complete with an effluent treatment system... login required. |
Details... |
1.6km |
22/01/2021 |
CONDITIONAL |
Freagh , Newport , Co. Tipperary |
an entrance porch to the front of the existing dwelling and a stand alone detached games room situated to the rear of the existing dwelling... login required. |
Details... |
1.2km |
18/01/2021 |
CONDITIONAL |
Coole , Newport , Co. Tipperary |
demolition of existing single storey cottage (and outbuildings) and construction of a new single and part two storey dwelling house on the site, new single storey garage,... login required. |
Details... |
2.8km |
18/12/2020 |
CONDITIONAL |
Newport Wastewater Treatment Plant , Newport , Co. Tipperary |
upgrade of the existing wastewater treatment plant to increase the treatment capacity, comprising of the decommissioning of the existing inlet works including the decommissioning of the existing stormwater overflow outfall from the inlet screens contained therein; the constuction of a new above ground inlet screening works area, the provision of 1 no. above ground ferric dosing system and associated storage tanks, 1 no. oxidation ditch (to ... login required. |
Details... |
2.6km |
17/12/2020 |
CONDITIONAL |
Rockvale , Newport , Co. Tipperary |
construction of a single storey rear extension and all associated site works... login required. |
Details... |
2.8km |
17/12/2020 |
CONDITIONAL |
Shower , Newport , Co. Tipperary |
construction of an extension to domestic garage... login required. |
Details... |