2.5km |
11/04/2022 |
N/A |
Garranacool and Ballingarry Upper , Ballingarry , Thurles Co. Tipperary |
two agricultural entrances and all associated works... login required. |
Details... |
2.5km |
31/03/2022 |
N/A |
Grawn/Foyle Ballingarry Thurles Co. Tipperary , Ballingarry , Thurles Co. Tipperary |
two agricultural entrances and all associated works... login required. |
Details... |
2.5km |
21/03/2022 |
N/A |
Grawn/Foyle Ballingarry Thurles Co. Tipperary , Ballingarry , Thurles Co. Tipperary |
permission for two agricultural entrances and all associated works... login required. |
Details... |
2.7km |
03/02/2022 |
CONDITIONAL |
Tinock Upper , Ballingarry , Thurles |
relates to a). milking parlour, associated yard area and fencing, b) three underground slatted storage tanks to north east of milking parlour yard area, c) one underground tank inside ... login required. |
Details... |
2.7km |
14/01/2022 |
N/A |
Tinock Upper , Ballingarry , Thurles |
Planning Permission for a) retention of milking parlour and associated yard area, b) retention of two underground slatted storage tanks to north of milking parlour ... login required. |
Details... |
1.2km |
05/11/2021 |
N/A |
Coolanshinnagh Ardragh Gortfree Bolakeale , Co. Tipperary |
a ten-year appropriate period planning permission for development of this site: the proposed development will constitute the provision of the following: the installation of 2.25 km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments. Advisory Note: The full extent of the grid connection is 33.8 km, and a separate planning applica... login required. |
Details... |
1.2km |
22/10/2021 |
N/A |
Coolanshinnagh Ardragh Gortfree Bolakeale , Co. Tipperary |
a ten-year appropriate period planning permission for development of this site: the proposed development will constitute the provision of the following: the installation of 2.25 km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments. Advisory Note: The full extent of the grid connection is 33.8 km, and a separate planning applica... login required. |
Details... |
2.7km |
03/09/2021 |
CONDITIONAL |
Tinock Upper , Ballingarry , Thurles |
construction of a concrete pad 4m X 4m in area, to accommodate the installation of a stainless-steel milk cooling tank with aluminium cladding together with attached ladder. The overall unit measures 5.94m in height, with a capacity of 31,480 litres... login required. |
Details... |
2.7km |
16/08/2021 |
N/A |
Tinock Upper , Ballingarry , Thurles |
Construction of a concrete pad 4mx4m in area to accommodate the installation of a stainless-steel milk cooling tank with aluminium cladding together with attached ladder. The overall unit measures 5.94m in height with a capacity of 31,480 litres.... login required. |
Details... |
2.7km |
29/07/2021 |
N/A |
Tinock , Ballingarry , Thurles |
construction of a concrete pad 4m X 4m in area to accommodate the installation of a stainless steel milk cooling tank with aluminium cladding together with attached ladder, the overall unit measures 5.94m in height with a capacity of 31480 litres... login required. |
Details... |
1km |
27/07/2021 |
N/A |
Coolnashinnagh Ardagh Gortfree and Bolakeale , Co. Tipperary |
a ten year appropriate period planning permission for the installation of 2.25km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments in the townlands of Coolnashinnagh, Ardragh, Bolakeale & Gortfree, Co. Tipperary. Advisory Note: The full extent of the grid connection is 33.8km, and a separate planning application wil... login required. |
Details... |
1.2km |
22/07/2021 |
N/A |
Coolnashinnagh Ardagh Gortfree and Bolakeale , Co. Tipperary |
a ten year appropriate period planning permission for the installation of 2.25km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments in the townlands of Coolnashinnagh, Ardragh, Bolakeale & Gortfree, Co. Tipperary. Advisory Note: The full extent of the grid connection is 33.8km, and a separate planning application wil... login required. |
Details... |
3km |
21/07/2021 |
CONDITIONAL |
Ballingarry Upper , Thurles , Co. Tipperary |
a dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works... login required. |
Details... |
3km |
13/07/2021 |
N/A |
Ballingarry Upper , Thurles , Co. Tipperary |
build a dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works... login required. |
Details... |
2.4km |
05/07/2021 |
CONDITIONAL |
Jessfield , Ballingarry , Thurles |
sun room extension built at gable of existing dwelling including associated site works... login required. |
Details... |
2.4km |
23/06/2021 |
N/A |
Jessfield , Ballingarry , Thurles |
retain sun room extension built at gable of existing dwelling including associated site works... login required. |
Details... |
900m |
01/09/2020 |
CONDITIONAL |
Farranrory Upper Farranrory Lower Coolnashinnagh and Gortnasmuttaun , Co. Tipperary |
a ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall g... login required. |
Details... |
1km |
17/08/2020 |
N/A |
Farranrory Upper Farranrory Lower Coolnashinnagh and Gortnasmuttaun , Co. Tipperary |
a ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall g... login required. |
Details... |
1.6km |
24/06/2020 |
CONDITIONAL |
Bolakeale , The Commons , Thurles |
construction of (i) cubicle shed with underground effluent tanks and loose straw area and all associated site works. Retention for wall silage pit with effluent tank also required... login required. |
Details... |
1.6km |
19/06/2020 |
N/A |
Bolakeale , The Commons , Thurles |
Permission to construct (i) cubicle shed with underground effluent tanks and loose straw area and all associated site works. Retention for wall silage pit with effluent tank also required... login required. |
Details... |