1.9km |
25/02/2022 |
CONDITIONAL |
Kyleagarry Ballyryan East and Gortdrum , Donohill |
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. |
Details... |
1.9km |
17/02/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Donohill |
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. |
Details... |
1.3km |
17/02/2022 |
CONDITIONAL |
Solloghodbeg , Donohill |
To demolish existing dwelling house and for permission to construct new dwelling house, waste water treatment system, soil polishing filter and associated site works ... login required. |
Details... |
1.9km |
08/02/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary |
a 10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.... login required. |
Details... |
1.7km |
03/02/2022 |
CONDITIONAL |
Cloonmalonga , Donohill , Co. Tipperary |
to erect a bungalow, domestic garage, effluent treatment tank and percolation system, entrance and all associated ancillary works... login required. |
Details... |
1.9km |
28/01/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary |
a10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4... login required. |
Details... |
2.8km |
21/01/2022 |
CONDITIONAL |
Solohead Farm , Knockaneduff , Donohill |
(a) Decommission 2 no. existing slurry lagoons and a dungstead, (b) Construct an extension to the side of existing cubicle shed with new underground slatted slurry storage tanks, (c) Demolish existing straw bedded shed and constr... login required. |
Details... |
2.8km |
16/12/2021 |
N/A |
Solohead Farm , Knockaneduff , Donohill |
(a) Decommission 2 no. existing slurry lagoons and a dungstead, (b) Construct an extension to the side of existing cubicle shed with new underground slatted slurry storage tanks, (c) Demolish existing straw bedded shed and constr... login required. |
Details... |
970m |
07/12/2021 |
CONDITIONAL |
Gortdrum , Donohill , Co. Tipperary E34 NV21 |
the following: Effluent treatment system comprising treatment unit and polishing filter; and all associated site and ancillary works... login required. |
Details... |
2.1km |
11/10/2021 |
N/A |
Kyle , Solohead , Co. Tipperary |
the demolished cottage and Permisison to erect in its place a dormer type bungalow with effluent treatment tank and percolation system and all associated ancillary works... login required. |
Details... |
2.1km |
20/09/2021 |
N/A |
Kyle , Solohead , Co. Tipperary |
demolish cottage and Planning Permission to erect in its place a dormer type bungalow... login required. |
Details... |
1.5km |
31/08/2021 |
CONDITIONAL |
Farranaclara , Donohill , Co. Tipperary |
construction of a vehicular entrance, dwelling house, garage, domestic waste water treatment plant with polishing filter together with all associated site works... login required. |
Details... |
3km |
23/08/2021 |
CONDITIONAL |
Lower Monard , Monard , Co. Tipperary |
a single storey dwelling, site entrance, wastewater system and raised polishing filter, rainwater harvesting system, separate garage and all associated site works... login required. |
Details... |
2.1km |
28/07/2021 |
CONDITIONAL |
Barnanalleen and Lisheennamalausa , Co. Tipperary |
a 10 year planning permission for a solar development on a 39 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; Upgrading of existing laneway to permit access to a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); Security fencing around the proposed su... login required. |
Details... |
2.2km |
22/07/2021 |
N/A |
Barnanalleen and Lisheennamalausa , Co. Tipperary |
a 10 year planning permission for a solar development on a 39 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; Upgrading of existing laneway to permit access to a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); Security fencing around the proposed su... login required. |
Details... |
1.8km |
22/07/2021 |
CONDITIONAL |
Farranclara , Donohill Road , Tipperary |
combined entrance which will replace stand alone entrance under Planning Ref. 18601234, dwelling house, domestic garage, septic tank & percolation area and associated site works... login required. |
Details... |
2.9km |
21/07/2021 |
CONDITIONAL |
Carron , Tipperary , Co. Tipperary |
the construction of a 24 metre high free standing communication structure with associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network... login required. |
Details... |
2.2km |
05/07/2021 |
N/A |
Barnanalleen and Lisheennamalausa , Co Tipperary |
a 10 year planning permission for a solar development on a 42.2 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be be upgraded and internal accesses; Upgrading of existing laneway to permit access a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); security fencing around the proposed s... login required. |
Details... |
2.9km |
11/06/2021 |
N/A |
Carron , Tipperary , Co. Tipperary |
the construction of a 24 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network... login required. |
Details... |
2.8km |
26/05/2021 |
CONDITIONAL |
Garryshane , Donohill , Co. Tipperary |
construction of a wastewater pumping station and associated site works... login required. |