1.8km |
28/02/2022 |
CONDITIONAL |
Cooleeny , Moyne , Thurles |
construction of a new dwelling, domestic garage, entrance and waste water treatment system with all associated site works... login required. |
Details... |
1.8km |
21/02/2022 |
N/A |
Cooleeny , Moyne , Thurles |
construction of a new dwelling, domestic garage, entrance and waste water treatment system with all associated site works... login required. |
Details... |
2.8km |
10/11/2021 |
N/A |
Lisdonowley , Moyne , Thurles |
a) construction of a new, part two-storey, part single-storey detached dwelling, b) new detached garage, c) new site entrance, d) new connections to existing utilities, e) new waste-water treatment system and percolation area, f) all associated site works... login required. |
Details... |
2.9km |
18/08/2021 |
CONDITIONAL |
Lisdonowley , Moyne , Thurles |
construction of a slatted house with slurry tank, loose house, two loose house extensions to existing slatted house and associated works... login required. |
Details... |
1.3km |
11/08/2021 |
CONDITIONAL |
Cooleeney , Moyne , Thurles Co. Tipperary |
construction of 2 no. livestock underpasses and effluent holding tanks and all associated siteworks... login required. |
Details... |
940m |
10/08/2021 |
CONDITIONAL |
Former Maintenance Depot Former Lisheen Mine , Kiloran , Moyne Thurles Co. Tipperary |
1) Demolition of the existing loading bay canopy 2) Change of use from maintenance depot to an agri-food sector Research and Development Unit for light indutrial use with ancillary office space 3) Extension of the existing first floor accomodation by 169 sqm. 4) Construction of an external stair to the rear, additional win... login required. |
Details... |
1.8km |
30/07/2021 |
CONDITIONAL |
Cooleeny , Derryfadda and Killoran , Co. Tipperary |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 ... login required. |
Details... |
1.7km |
21/07/2021 |
N/A |
DerryFadda , Cooleeny , Killoran |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x... login required. |
Details... |
1.1km |
09/07/2021 |
UNCONDITIONAL |
Cooleeney , Moyne , Thurles Co. Tipperary |
an extension to cheese production unit, to retain existing storage area and incorporate into the new extension and to retain staff changing area. Also for permission to provide access yard and carry out all associated works. Works are within the curtilage of a protected structure, S778. ... login required. |
Details... |
1.6km |
19/05/2021 |
CONDITIONAL |
Cooleeney and Derryfadda , Moyne , Thurles Co. Tipperary |
building (3657 sq m) with a car park and access road, commercial yard area and access road, truck prep building (110 sq m), 2 m high boundary architectural fence, signage, public lighting, solar panels to the building roof, an on-site waste water... login required. |
Details... |
1.8km |
14/05/2021 |
CONDITIONAL |
Moynetemple , Moyne , Thurles Co. Tipperary |
change of use of existing building from health centre to a cafe and shop, works will involve internal layout alterations and some external alterations to the building including outdoor dining area with all associated site works... login required. |
Details... |
1.8km |
30/04/2021 |
N/A |
Moynetemple , Moyne , Thurles Co. Tipperary |
change of use of existing building from Health Centre to a café and shop, the works will involve internal layout alterations and some external alterations to the building with all asociated site works... login required. |
Details... |
1.3km |
27/04/2021 |
N/A |
Killoran near Templetuohy , Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co.... login required. |
Details... |
1.8km |
13/04/2021 |
N/A |
Moynetemple , Moyne , Thurles |
change of use of existing building from Health Centre to a café and shop, the works will involve internal layout alterations and some external alterations to the building with all asociated site works... login required. |
Details... |
1.6km |
25/02/2021 |
CONDITIONAL |
Killoran , Templetuohy , Thurles Co. Tipperary |
the as constructed extension to existing dwelling house and all associated site works and PERMISSION for new waste water treatment system... login required. |
Details... |
1.2km |
16/12/2020 |
CONDITIONAL |
Cooleeney , Moyne , Thurles Co. Tipperary |
build an electricity sub station and carry out all associated works adjacent to Cheese Production Unit, works are within the curtilage of a protected structure S778... login required. |
Details... |
2.7km |
21/10/2020 |
CONDITIONAL |
Barnalisheen , Templetouhy , Thurles |
a livestock underpass, effluent holding tank and all associated site works... login required. |
Details... |
1.8km |
31/07/2020 |
CONDITIONAL |
Moynetemple , Moyne , Thurles |
construction of an extension to house with all associated site works... login required. |
Details... |
1.1km |
28/07/2020 |
CONDITIONAL |
Killoran , Templetuohy , Co Tipperary |
works within the boundary of the existing Lisheen 110 kV Substation, the proposed works will comprise: replacement and improvement works to an existing electrical transformer bund; construction of two new concrete plinths for associated electrical infrastructure; inst... login required. |
Details... |
2.6km |
27/07/2020 |
CONDITIONAL |
Derryville , Moyne , Thurles Co. Tipperary |
the acceptance and processing of organic waste materials at the existing Anaerobic Digestion Facility of up to 30,000 tonnes per annum; glass lined steel digestate storage tank of 46.1m in diameter and 5.67m in height; an office ... login required. |
Details... |