760m |
18/11/2019 |
REFUSED |
CARTRON EAST , TULLAMORE , CO OFFALY |
CONSTRUCTION OF SLATTED SHED, SILAGE SLAB AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
3km |
02/09/2019 |
CONDITIONAL |
MIDFREIGHT SHIPPING LIMITED CAPPANCUR TD. , CAPPINCUR INDUSTRIAL ESTATE TULLAMORE , CO. OFFALY |
CONSTRUCTION OF A 24 METRE HIGH MULTI-USER LATTICE TELECOMMUNICATIONS STRUCTURE, CARRYING ANTENNA AND DISHES ENCLOSED WITHIN A 2.4 METRE HIGH PALISADE FENCE COMPOUND WITH ASSOCIATED GROUND EQUIPMENT AND ASSOCIATED SITE WORKS... login required. |
Details... |
1.7km |
12/07/2019 |
CONDITIONAL |
BALLYNAMONA , TULLAMORE , CO. OFFALY |
(A) CONSTRUCTION OF A SHED AND PLANT ROOM WITH OVERHEAD STORAGE TO REAR OF EXISTING DWELLING, (B) CONSTRUCT A CAR-PORT CONNECTING EXISTING DWELLING TO PROPOSED SHED, (C) CONVERT EXISTING GARAGE TO NORTH EAST OF EXISTING DWELLING TO GYM AND UTILITY ROOM (D) CONSTRUCT A NOOK TO SOUTH WEST OF EXISTI... login required. |
Details... |
2.9km |
10/07/2019 |
CONDITIONAL |
CAPPINCUR , TULLAMORE , CO OFFALY |
DEMOLITION OF AN EXISTING GARAGE, THE CONSTRUCTION OF A NEW GARAGE, THE CONSTRUCTION OF AN EXTENSION TO AN EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
02/07/2019 |
CONDITIONAL |
WOOD OF O , TULLAMORE , CO OFFALY |
CONSTRUCTION OF DWELLING HOUSE, SEPTIC TANK, PERCOLATION AREA AND ASSOCIATED SITE WORKS... login required. |
Details... |
1.7km |
01/07/2019 |
N/A |
BALLYMONA , TULLAMORE , CO OFFALY |
A) CONSTRUCT A SHED AND PLANT ROOM WITH OVERHEAD STORAGE TO REAR OF EXISTING DWELLING, B) CONSTRUCT A CAR-PORT CONNECTING EXISTING DWELLING TO PROPOSED SHED, C) CONVERT EXISTING GARAGE TO NORTH EAST OF EXISTING DWELLING TO GYM AND UTILITY ROOM, D) CONSTRUCT A NOOK TO SOUTH WEST OF EXISTING ... login required. |
Details... |
2.7km |
24/06/2019 |
CONDITIONAL |
CAPPINCUR , TULLAMORE , CO OFFALY R35 ET27 |
A FUEL SHED AND STORAGE AREA... login required. |
Details... |
2.1km |
12/06/2019 |
CONDITIONAL |
BALLEEK/ BALLYNAMONA , DURROW , TULLAMORE CO OFFALY |
A DOMESTIC GARAGE... login required. |
Details... |
1.8km |
05/06/2019 |
REFUSED |
BALLYNAMONA , DURROW , TULLAMORE |
ONE DETACHED TWO STOREY DWELLING AND ASSOCIATED SEPTIC TANK AND PERCOLATION AREA... login required. |
Details... |
1.8km |
24/05/2019 |
N/A |
BALLYMONA , DURROW TULLAMORE , CO OFFALY |
ONE DETACHED TWO STOREY DWELLING AND ASSOCIATED SEPTIC TANK AND PERCOLATION AREA... login required. |
Details... |
2.7km |
08/04/2019 |
N/A |
CAPPANCUR , TULLAMORE , CO OFFALY |
FUELS SHED & STORAGE AREA ... login required. |
Details... |
2.5km |
27/03/2019 |
CONDITIONAL |
CAPPINCUR ROAD , TULLAMORE , CO. OFFALY |
CONSTRUCTION OF A MAINTENANCE DEPOT WITH WAREHOUSES, ON SITE CAR/TRUCK PARKING AREA, EFFLUENT TREATMENT SYSTEM AND REVISED SITE ENTRANCES AND ALL ASSOCIATED SITE WORKS AND SERVICES... login required. |
Details... |
1.8km |
07/03/2019 |
N/A |
ARDEN LANE , ARDEN , TULLAMORE CO OFFALY |
CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW TREATMENT UNIT WITH PERCOLATION AREA, ENTRANCE AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE... login required. |
Details... |
1.8km |
08/02/2019 |
N/A |
ARDEN LANE , ARDEN , TULLAMORE CO OFFALY |
CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW TREATMENT UNIT WITH PERCOLATION AREA, ENTRANCE AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE... login required. |
Details... |
1.1km |
23/01/2019 |
CONDITIONAL |
BALLYCOSNEY , BALLYDALY , TULLAMORE |
FOR THE CONSTRUCTION OF SLATTED SHED AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.8km |
02/01/2019 |
CONDITIONAL |
CAPPINCUR , TULLAMORE CO OFFALY |
THE ERECTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE, AND TO INSTALL A PROPRIETARY TREATMENT SYSTEM WITH ASSOCIATED WORKS... login required. |
Details... |