40m |
02/09/2021 |
CONDITIONAL |
Cummer Beg Garracummer Birchgrove Moanvaun Curraghmarky & Cummermore , Hollyford , Co. Tipperary |
development at this site consisting of further continued use of two erected permanent 65m lattice meteoroloical masts previously granted under Planning Permission Ref 12/77 and extended under Planning Permission R... login required. |
Details... |
60m |
07/07/2021 |
N/A |
Cummer Beg Garracummer Birchgrove , Moanvaune Curraghmarky & Cummermore , Hollyford |
further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning Permission Ref. 12/77 and extended under Planning Permission Ref. 15600530 a... login required. |
Details... |
1.8km |
24/06/2021 |
N/A |
Foilycleary , Kilcommon , Thurles Co. Tipperary |
construction of a new longitudinal loading bay adjacent to the North Western side of the existing public road for temporary forest use, the longitudinal loading bay has been designed as per COFORD F... login required. |
Details... |
30m |
09/06/2021 |
N/A |
Cummer Beg Garracummer Birchgrove Moanvaune Curraghmarky and Cummermore , Hollyford , Co. Tipperary |
further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning Permission Ref. 12/77 and extended under Planning Permission Ref. 15600530 ... login required. |
Details... |
2.7km |
14/01/2020 |
CONDITIONAL |
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford |
development consisting of the installation of battery arrays, located within container units (18 number units, each 30m2 by c.2.6m tall), a control building (c.160.5m2 by c.6.4m tall) and transformer (c.5m tall). The developm... login required. |
Details... |
2.7km |
25/11/2019 |
N/A |
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford |
development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The developm... login required. |
Details... |
2.7km |
18/11/2019 |
N/A |
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford |
development consisting of the installation of battery arrays, located within container units (19 number units, each 30m2 by c.2.6m tall), a control building (c.1605m2 by c.6.4m tall) and transformer (c.5m tall). The developm... login required. |
Details... |
2.2km |
21/10/2019 |
CONDITIONAL |
Foildarg , Cappawhite , Co. Tipperary |
the construction of new entrance from public roadway onto forestry lands, to comprise the provision of splayed access, clear visibility sightlines, associated setting ... login required. |
Details... |
1.7km |
08/10/2019 |
CONDITIONAL |
Curraghmarky , Doon |
construction of an entrance, one and a half story dwelling house, garage, domestic waste water treatment system and polishing filter together with all associated site works... login required. |
Details... |
2km |
13/03/2019 |
N/A |
Glengar , Cappawhite , Co Tipperary |
partially completed dwelling and entrance and permission to complete the partially completed dwelling installation of a waste water treatment system and associated works... login required. |
Details... |
1.7km |
19/02/2019 |
N/A |
Curraghmarky , Doon , Co. Tipperary |
a dwelling house, waste water treatment system, entrance and driveway with all ancillary site works... login required. |
Details... |
1.7km |
21/01/2019 |
N/A |
Curraghmarky , Doon , Co. Tipperary |
development consisting of a dwelling house, waste water treatment system, entrance and driveway with all ancillary site works... login required. |
Details... |