1.6km |
06/04/2022 |
N/A |
IRELAND WEST AIRPORT KNOCK , KILGARRIFF , CHARLESTOWN |
NEW FULLY WEATHERED 2 STOREY EXTERNAL FIRE ESCAPE STAIRS FROM FIRST FLOOR LEVEL ON THE WEST ELEVATION AND A MATERIAL ALTERATION OF PROPOSED WINDOWS TO THE WESTERN FACADE ADJACENT THE ARRIVAL HALL WITH ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.1km |
29/09/2021 |
REFUSED |
TOMBOHOLLA , CHARLESTOWN |
DEMOLITION OF EXISTING OUTBUILDINGS, PARTIAL DEMOLITION AND REFURBISHMENT OF EXISTING DWELLING AND CONSTRUCTION OF NEW 214M2 TWO STOREY EXTENSION INCLUDING SEPTIC TANK AND PERCOLATION AREA WITH ASSOCIATED SITE WORKS AS REQUIRED... login required. |
Details... |
1.9km |
03/06/2021 |
CONDITIONAL |
BARNACAHOGE TD , SWINFORD |
RETENTION PERMISSION FOR THE DWELLING HOUSE AND DOMESTIC GARAGE AS CONSTRUCTED ALONG WITH ALL ANCILLARY SITE WORKS, PREVIOUS PLANNING REF. P03/3245... login required. |
Details... |
1.4km |
08/04/2021 |
CONDITIONAL |
KNOCK AIRPORT , BARNALYRA , CHARLESTOWN |
THE PROPOSED DEVELOPMENT CONSISTS OF A SINGLE STOREY PART FLAT, PART MONO-PITCHED ROOFED FIRE SERVICE TRAINING FACILITY, TO BE ACCESSED VIA THE EXISTING INTERNAL AIRPORT (AIRSIDE) ROAD NETWORK;ASSOCIATED VEHICLE PARKING,HARD AND SOFT LANDSC... login required. |
Details... |
2.8km |
03/02/2021 |
N/A |
LURGA , CHARLESTOWN , CO MAYO |
DEMOLISH EXISTING DWELLING HOUSE AND OUT-BUILDINGS, AND CONSTRUCT NEW DWELLING HOUSE, INSTALL A WASTE WATER TREATMENT UNIT WITH A RAISED SOIL POLISHING FILTER, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES ON THIS SITE... login required. |
Details... |
980m |
17/12/2020 |
CONDITIONAL |
Knock Airport Business Park , Kilgarriff West , Charlestown |
The development will consist of the construction of an aircraft hangar, adjacent ancillary aircraft storage area, a new vehicular access road onto R376, staff and visitor parking, secure bicycle stands, signage and wayfinding with all associated site works.... login required. |
Details... |
2.9km |
17/08/2020 |
CONDITIONAL |
KILLATURLY , SWINFORD |
CONSTRUCT DWELLING HOUSE AND GARAGE WITH SEPTIC TANK AND PERCOLATION AREA, INCLUDING ALL OTHER ANCILLARY SITE WORK AND SERVICES.... login required. |
Details... |
1.5km |
24/04/2020 |
CONDITIONAL |
CARN , CHARLESTOWN |
DEMOLISH EXISTING STORAGE BUILDING, EXTENSION OF EXISTING 3 BAY SHED, CONSTRUCTION OF A 4 BAY OPEN SLATTED SHED WITH A CREEP AREA AND UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS.... login required. |
Details... |
2.7km |
27/02/2020 |
N/A |
TOMBOHOLLA , BUSHFIELD , CHARLESTOWN |
CONSTRUCTION OF A PERMANENT SITE ACCESS ENTRANCE FOR PURPOSE OF TREE FELLING OF MATURE FOREST.... login required. |
Details... |
2km |
28/08/2019 |
CONDITIONAL |
TOMBOHOLLA , CHARLESTOWN , CO. MAYO |
CONSTRUCT A 5 BAY SLATTED SHED WITH AN UNDERGROUND EFFLUENT STORAGE TANK, MEAL BIN AND SILAGE APRON AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.1km |
23/08/2019 |
CONDITIONAL |
KNOCK AIRPORT BUSINESS PARK , KILGARRIFF WEST , CHARLESTOWN |
CONSTRUCT A NEW REPLACEMENT WAREHOUSING/STORAGE UNIT TOGETHER WITH CONNECTION TO EXISTING SERVICES INCLUDING ALL ANCILLARY SITE WORKS AND SERVICES ON THIS SITE... login required. |
Details... |
3km |
13/05/2019 |
CONDITIONAL |
MULLENMADOGE , SWINFORD , CO. MAYO |
CONSTRUCT NEW FRONT PORCH AND ALTERATIONS TO THE ELEVATIONS AND FENESTRATION ALONG WITH ASSOCIATED WORKS AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
1.7km |
06/03/2019 |
CONDITIONAL |
BARNALYRA , CHARLESTOWN , CO. MAYO |
RETENTION OF EXTENSIONS AS CONSTRUCTED TO THE PRE-EXISTING DWELLING, AND PERMISSION TO RELCOATE AND UPGRADE THE EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |