1km |
07/04/2022 |
N/A |
CROSS WEST TD. , CROSS , CLAREMORRIS |
RETAIN EXTENSIONS CONSTRUCTED TO THE SIDE OF EXISTING DWELLING HOUSE, DOMESTIC SHED TO THE REAR OF THE PROPERTY AND FRONT BOUNDARY WALL AS CONSTRUCTED ALONG WITH ALL ASSOCIATED SITE SERVICES... login required. |
Details... |
2.9km |
25/02/2022 |
N/A |
BALLYNALTY TD , GLENCORRIB , SHRULE |
CONSTRUCT A PRIVATE DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICES... login required. |
Details... |
2.9km |
20/12/2021 |
CONDITIONAL |
CURNICARTON , KILMAINE |
RELOCATION OF EXISTING SEPTIC TANK AND PERCOLATION AREA... login required. |
Details... |
1.3km |
22/11/2021 |
N/A |
HOUNDSWOOD NORTH TD , CROSS , CONG |
CONSTRUCT A PRIVATE DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICES... login required. |
Details... |
1.7km |
13/08/2021 |
REFUSED |
CROSS EAST , CROSS , CLAREMORRIS |
CONSTRUCTION OF AN ANNEX, UPGRADE OF EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.1km |
01/07/2021 |
CONDITIONAL |
BALLYNALTY , CO. MAYO |
INSTALLATION OF FENCING, SOLAR PUMPS AND DRINKING TROUGHS. A NATURA IMPACT STATEMENT HAS BEEN PREPARED IN RESPECT OF THIS PROPOSED DEVELOPMENT... login required. |
Details... |
2.9km |
20/05/2021 |
CONDITIONAL |
KNOCK NORTH , CROSS , CLAREMORRIS |
DEMOLISH EXISTING DERELICT AGRICULTURAL BUILDING, REMOVAL OF EXISTING BUILDING FOUNDATION ON THE SITE, CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, ONSITE WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY SITE WORKS ... login required. |
Details... |
2.9km |
12/05/2021 |
CONDITIONAL |
BALLYNALTY TOWNLAND , GLENCORRIB , SHRULE |
CONSTRUCT A DWELLING HOUSE, SEWAGE TREATMENT SYSTEM AND DOMESTIC GARAGE ... login required. |
Details... |
2.7km |
10/05/2021 |
CONDITIONAL |
THE SALTHOUSE , DERRY QUAY , CROSS |
ALTERATIONS AND EXTENSION OF THE EXISTING DWELLING FROM 120SQM TO 205SQM AND WILL INCLUDE THE FOLLOWING: DEMOLITION OF AN EXISTING FRONT PORCH (10SQM); CONSTRUCTION OF NEW SINGLE STOREY PITCHED ROOF EXTENSION TO THE REAR (95SQM)WITH A COVERED TERRACE OFF THE LIVING AREA (8SQM); EXTERNAL ALTERATIONS IN... login required. |
Details... |
1.6km |
07/05/2021 |
CONDITIONAL |
DOWAGH WEST , CROSS , CO MAYO |
DEMOLITION OF EXISTING NON-HABITABLE COTTAGE AND CONSTRUCTION OF A DETACHED DWELLING HOUSE, PROPRIETARY TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
29/04/2021 |
CONDITIONAL |
WOODPARK , GLENCORRIB , SHRULE |
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, ONSITE WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.1km |
09/04/2021 |
CONDITIONAL |
CARHEENS , CROSS , CLAREMORRIS |
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, ONSITE WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
1.6km |
05/03/2021 |
N/A |
DOWAGH WEST , CROSS , CO MAYO |
CONSTRUCTION OF A DOMESTIC DWELLING HOUSE, PROPRIETARY TREATMENT SYSTEM AND ASSOCIATED SITE WORKS... login required. |
Details... |
1km |
09/02/2021 |
CONDITIONAL |
CROSSWEST , CROSS , CLAREMORRIS |
CONSTRUCT AGRICULTURAL BUILDING FOR HAY, STRAW AND FEED AND ALL ANCILLARY WORKS... login required. |
Details... |
2.6km |
10/12/2020 |
CONDITIONAL |
KNOCK SOUTH , CROSS , CONG |
CONSTRUCTION OF AN EXTENSION TO THE EXISTING BUILDING, INSTALLATION OF DIESEL TANKS AND DIESEL PUMPS WITH A CANOPY OVERHEAD, CONSTRUCTION OF CONCRETE BUNDS FOR THE DIESEL TANKS AND CONSTRUCTION OF STORAGE SHED WITH A WASH BAY AREA ... login required. |
Details... |
1.3km |
23/11/2020 |
CONDITIONAL |
BALLYMACGIBBON NORTH TD , CROSS , CO MAYO |
CONSTRUCTION OF A NEW PRIVATE ENTRANCE ON REVISED SITE BOUNDARIES TO EXISTING PRIVATE DWELLING HOUSE AND CONSTRUCTION OF AN AGRICULTURAL ENTRANCE TO LANDS AND ASSOCIATED FARM YARD... login required. |
Details... |
760m |
16/11/2020 |
CONDITIONAL |
CORDRON , CROSS , CLAREMORRIS |
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, ONSITE WASTEWATER TREATMETN SYSTEM AND ALL ANCILLARY SITE WORKS.... login required. |
Details... |
2.5km |
13/11/2020 |
CONDITIONAL |
BALLYMACGIBBON NORTH , CROSS , CLAREMORRIS |
CONSTRUCT DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICES.... login required. |
Details... |
1.4km |
02/11/2020 |
CONDITIONAL |
CROSS EAST , CROSS , CLAREMORRIS |
CONSTRUCT A 5 BAY ENCLOSED SLATTED SHED AND UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS.... login required. |
Details... |
310m |
25/09/2020 |
CONDITIONAL |
HOUNDSWOOD , CROSS , CLAREMORRIS |
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, ONSITE WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY SITE WORKS.... login required. |
Details... |