2.5km |
07/02/2022 |
N/A |
MACE NORTH , WESTPORT |
CONSTRUCT DWELLINGHOUSE AND DOMESTIC GARAGE WITH CONNECTION TO PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ASSOCIATED SITE SERVICES... login required. |
Details... |
2.7km |
24/11/2021 |
N/A |
KILBREE LOWER , SHEEAUNE , WESTPORT |
CONSTRUCT A GENERAL PURPOSE SHED ... login required. |
Details... |
2.1km |
28/10/2021 |
CONDITIONAL |
DOOLEAGUE , ISLANDEADY , CASTLEBAR |
RETENTION PERMISSION OF AN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE PREVIOUSLY GRANTED UNDER P14/404 TOGETHER WITH ASSOCIATED GROUND EQUIPMENT CABINETS AND SECURITY FENCE... login required. |
Details... |
1.6km |
07/10/2021 |
CONDITIONAL |
KILBREE UPPER , WESTPORT |
CONSTRUCT DWELLING HOUSE, WASTEWATER TREATMENT UNIT AND PERCOLATION AREA... login required. |
Details... |
2.7km |
04/10/2021 |
CONDITIONAL |
EIR EXCHANGE , TOORBUCK , AYLE |
REPLACE A 15M TELECOMMUNICATIONS MONOPOLE WITH A 21M TELECOMMUNICATIONS MONOPOLE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT... login required. |
Details... |
1.7km |
24/09/2021 |
CONDITIONAL |
KILBREE UPPER , WESTPORT , CO MAYOI |
CONSTRUCT EXTENSION TO EXISTING DWELLING HOUSE ... login required. |
Details... |
2.5km |
18/08/2021 |
CONDITIONAL |
TOORBUCK , WESTPORT , CO MAYO |
CONSTRUCT A DWELLING HOUSE AND TO UTILISE THE EXISTING BUILDING AS A GRANNY FLAT/ANCILLARY BUILDING WITH ALL ANCILLARY SITE WORKS, P99/524 & P16/568 REFER... login required. |
Details... |
2.8km |
25/06/2021 |
CONDITIONAL |
ROCKFIELD , WESTPORT |
CONSTRUCT A DWELLING HOUSE, GARAGE, EFFLUENT TREATMENT AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
23/06/2021 |
CONDITIONAL |
KILBREE LOWER , SHEEAUNE , WESTPORT |
CONSTRUCT DWELLING HOUSE, GARAGE, WASTEWATER TREATMENT UNIT AND PERCOLATION AREA ... login required. |
Details... |
2.5km |
14/06/2021 |
N/A |
TOORBUCK , WESTPORT , CO MAYO |
CONSTRUCT A DWELLING HOUSE AND TO UTILISE THE EXISTING BUILDING AS A GRANNY FLAT/ANCILLARY BUILDING WITH ALL ANCILLARY SITE WORKS, P99/524 & P16/658 REFER ... login required. |
Details... |
2.5km |
04/05/2021 |
CONDITIONAL |
CLOONAN , ISLANDEADY , CO MAYO |
CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH ASSOCIATED SITE SERVICES... login required. |
Details... |
2.5km |
01/04/2021 |
N/A |
Toorbuck , Westport , Co. Mayo |
Construct a replacement dwelling house together with all ancillary site works , P 99/524 and P 16/658 refer.... login required. |
Details... |
2.6km |
22/03/2021 |
Conditional |
Rockfield, Sheean, Westport, Co. Mayo |
Extension and alterations to existing house, together with all ancillary site works and services... login required. |
Details... |
2.7km |
15/02/2021 |
CONDITIONAL |
KILLADEER , BALLYHEANE , CASTLEBAR |
CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH ASSOCIATED SITE SERVICES... login required. |
Details... |
2.3km |
21/01/2021 |
N/A |
KILBREE LOWER , CLOGHER , CASTLEBAR |
A DEPOSITION ARE FOR SURPLUS FILL MATERIAL (INERT SOIL & SUBSOIL) ON A 5.9 HECTARE SITE ... login required. |
Details... |
1.6km |
27/10/2020 |
CONDITIONAL |
CLAGGARNAGH WEST , ISLANDEADY , CASTLEBAR |
CHANGE OF HOUSE TYPE AND GARAGE PREVIOUSLY GRANTED UNDER P18/734... login required. |
Details... |
1.6km |
28/09/2020 |
CONDITIONAL |
KILBREE UPPER , WESTPORT |
CONSTRUCT DWELLING HOUSE, WASTEWATER TREATMENT UNIT AND PERCOLATION AREA.... login required. |
Details... |
780m |
21/09/2020 |
CONDITIONAL |
CASHEL , AYLE , WESTPORT |
CONSTRUCT DWELLING HOUSE, WASTE WATER TREATMENT UNIT AND PERCOLATION AREA.... login required. |
Details... |
1.6km |
18/09/2020 |
CONDITIONAL |
BALLYNAMARROGE , CASTLEBAR |
CONSTRUCT DWELLING HOUSE, DOMESTIC GARAGE, ACCESS ROADWAY, SEPTIC TANK AND PERCOLATION AREA AND ALL ANCILLARY WORKS.... login required. |
Details... |
2.9km |
06/05/2020 |
CONDITIONAL |
CLAGGERNAGH EAST , ISLANDEADY , CASTLEBAR |
THE EXTRACTION AND PROCESSING OF ROAD CONSTRUCTION MATERIALS FOR THE PROPOSED N5 WESTPORT TO TURLOUGH ROAD AND TO REPLACE THE MATERIALS WITH INERT FILL FROM THE AFOREMENTIONED PROJECT (SURPLUS INERT SOIL AND SUBSOIL) ON A 4.95 HECTARE SITE.... login required. |
Details... |