900m |
20/02/2024 |
N/A |
IDA Industrial Park , Old Kilmeadan Road , Knockhouse Lower Waterford. |
Proposed solar PV energy development comprising the installation of solar photovoltaic (PV) panels on ground mounted frames/ support structures, underground cabling and ducting, inverters, client kiosk, security fencing, pole mounted CCTV cameras, landscaping, temporary... login required. |
Details... |
900m |
01/02/2024 |
CONDITIONAL |
49 Pinewood Avenue , Hillview , Waterford |
for the construction of a first floor extension above the existing converted garage together with all associated works... login required. |
Details... |
2km |
29/11/2023 |
N/A |
DAWN PORK & BACON , GRANNAGH BUSINESS COMPLEX GRANNAGH , WATERFORD CO KILKENNY |
for development at this site. The development will consist of : erecting a 2MW Wind Turbine, located to the southwest of our main building; the Wind Turbine will be installed with a hub height of 64 meters and a blade radius of 35.5 meters, with underground ducting connecting... login required. |
Details... |
780m |
29/11/2023 |
CONDITIONAL |
60 Pinewood Avenue , Hillview , Waterford |
The construction of a single storey extension to the side, modifications to the existing front elevation and all associated site works.... login required. |
Details... |
450m |
29/11/2023 |
N/A |
Unit C & D Mount Suir Manor , Carrickpherish Road , Waterford |
Change of use from retail units to live/ works units comprising 2 no.1 bedroom apartments with workshops to rear, private open space area to front of block for 2 apartments... login required. |
Details... |
1000m |
24/11/2023 |
REFUSED |
Quarry Road-Bilberry Road , Waterford |
Extension of duration for construction of 36 dwelling houses as permissioned under ref no 12500066 (extended under 17/222 and 22/798), together with all public lighting, foul drainage... login required. |
Details... |
1000m |
24/11/2023 |
REFUSED |
Quarry Road-Bilberry Road , Waterford |
Extension of Duration for construction of 44 dwelling houses as permissioned under Ref No. 18/804, together with all public works of roads, paths, public lighting, foul drainage... login required. |
Details... |
2.9km |
05/10/2023 |
CONDITIONAL |
Woodstown , Butlerstown , Waterford |
to erect a dwelling house with sewage treatment system & all ancillary works... login required. |
Details... |
2.6km |
04/10/2023 |
CONDITIONAL |
Costa Coffee Unit , Waterford Retail Park , Cork Road Butlerstown |
Provision of a drive-thru lane for the Costa Coffee Unit, including a canopy and service hatch on the southwestern side of the unit, a height restrictor/entrance barrier on the access lane, 3.5m wide drive-thru lane and associated hard and soft landscaping, resulting in the removal of 24 no. existing carparking spaces; Provision of associated s... login required. |
Details... |
2.5km |
29/08/2023 |
REFUSED |
Waterford Retail Park , Cork Road , Butlerstown North Waterford |
development which will consist of a standalone 3 storey building to accommodate medical related uses with all associated ancillary accommodation and standalone ESB substation (totalling 3490sqm gross floor area). Access will be from the existing Waterford Retail Park access on the Outer Ring Road through the existing car park where an additional 102 park... login required. |
Details... |
2.3km |
28/08/2023 |
CONDITIONAL |
Grannagh , Kilmacow , Co. Kilkenny |
permission to construct a 1.5 storey dwelling, a detached garage of 60 sq mts, a new entrance to the public road along with all associated site development works... login required. |
Details... |
750m |
14/07/2023 |
CONDITIONAL |
14 Greenbank , Ashley Court , Waterford |
the construction of a new extension to existing house at First Floor Level over the existing Playroom/Study. The proposed extension will consist of a new master bedroom with en-suite and walk-in wardrobe... login required. |
Details... |
330m |
29/06/2023 |
CONDITIONAL |
Gracedieu Lodge , Gracedieu , Waterford |
RETENTION for an indefinite period of a small rear corridor extension and a domestic garage, rear door and windowand PERMISSION to construct a conservatory extension to existing dwelling ... login required. |
Details... |
330m |
15/06/2023 |
N/A |
Gracedieu Lodge , Gracedieu , Waterford |
RETENTION for an indefinite period of a small rear corridor extension and a domestic garage and Permission for the construction of conservatory extension to existing dwellings... login required. |
Details... |
2km |
12/05/2023 |
CONDITIONAL |
Grannagh Business Complex , Ballygriffin , Co. Kilkenny |
The development will consist of the demolition of 3 single storey structures, construction of a new building extension which will consist of a warehouse, forklift charging room, welfare facilities and all ancillary site works.... login required. |
Details... |
3km |
27/04/2023 |
CONDITIONAL |
Holycross Service Station , Butlerstown , Co. Waterford |
for six no. electric vehicle charging bays, electrical sub-station and all associated site works... login required. |
Details... |
840m |
29/03/2023 |
CONDITIONAL |
Quarry Road , Gracedieu , Waterford. |
planning permission for the partial demolition of existing house (dormer cottage) to facilitate the construction of a new two storey dwelling, with the remainder of the original house retained as a granny flat, together with boundary treatment, altered site access and all associated site works... login required. |
Details... |
2.4km |
29/03/2023 |
CONDITIONAL |
Hillview , Ballygriffin , Kilmacow |
to install a new wastewater treatment system and to de-commission the existing wastewater treatment system and all associated site works at Hillview, Ballygriffin, Kilmacow, Co.Kilkenny X91V3FR... login required. |
Details... |
840m |
16/03/2023 |
N/A |
Quarry Road , Gracedieu , Waterford. |
planning permission for the partial demolition of existing house (dormer cottage) to facilitate the construction of a new two storey dwelling, with the remainder of t... login required. |
Details... |
2km |
25/01/2023 |
CONDITIONAL |
Ballygriffin , Grannagh , Co Kilkenny |
for a single Storey extension to industrial premises to form a corridor linking existing Production Areas at the Main Yard of the Building, together with associated Site Works within the existing industrial facility... login required. |
Details... |