1.5km |
19/04/2022 |
N/A (Pre-Validation) |
BALLYMACOOL (URBAN) |
(1) ERECTION OF NEW FLOODLIGHTING AND BALLSTOPS TO AN EXISTING PLAYING FIELD (2) DEVELOPMENT OF (A) A NEW PLAYING FIELD (145M x 90M) WITH FLOODLIGHTING, GOALPOSTS AND BALLSTOPS (B) A NEW WALKING TRACK (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.4km |
05/03/2020 |
CONDITIONAL |
8 LEITIR ARD , CREEVESMITH , LETTERKENNY |
CONSTRUCTION OF A NEW STOREY AND A HALF PITCHED ROOF EXTENSION TO THE REAR (NORTH) OF EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
3km |
26/02/2020 |
CONDITIONAL |
CARRYGALLEY , LETTERKENNY , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK SYSTEM WITH ALL OTHER ASSOCIATED SITE WORKS... login required. |
Details... |
3km |
12/02/2020 |
N/A |
CARRYGALLEY , LETTERKENNY , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK SYSTEM WITH ALL OTHER ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
28/01/2020 |
REFUSED |
KIRKNEEDY , NEWMILLS , LETTERKENNY |
RETENTION AND COMPLETION OF EXTENSION UNDER CONSTRUCTION TO EXISTING DWELLING HOUSE ... login required. |
Details... |
3km |
22/01/2020 |
N/A |
CARRYGALLY , LETTERKENNY , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.8km |
30/12/2019 |
CONDITIONAL |
COILLTE FOREST , MILLTOWN , KILLYMASNY |
REMOVAL OF THE EXISTING PERMITTED 20M TELECOMMUNICATIONS SUPPORT STRUCTURE AND ASSOCIATED EQUIPMENT AND ERECTION OF A NEW 30M MULTI-USER TELECOMMUNICATIONS SUPPORT STRUCTURE CARRYING 3NO. ANTENNAS AND 1 NO. COMMUNICATION DISH RELOCATED FROM THE REMOVED 20M TELECOMMUNCATIONS SUPPORT STRUCTURE AND 9NO. NEW ANTENNAS AND ASSOCIATED REMOTE RADIO UN... login required. |
Details... |
3km |
04/12/2019 |
CONDITIONAL |
CARRYGALLY , LETTERKENNY , LETTERKENNY PO |
GARAGE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
11/11/2019 |
CONDITIONAL |
BALLYMACOOL , LETTERKENNY , LETTERKENNY PO |
CHANGE TO DESIGN OF DWELLING HOUSE PREVIOUSLY APPROVED UNDER PLANNING REF: 18/51746 CONSISTING OF A CHANGE TO THE MAIN ROOF FROM STEPPED DESIGN TO STRAIGHT ROOF AND INCLUSION OF 2 NO. SMALL PITCH ROOFS OVER THE BAY WINDOWS... login required. |
Details... |
550m |
01/11/2019 |
CONDITIONAL |
BOMANY , LETTERKENNY , LETTERKENNY PO |
CHANGE OF PREVIOUSLY APPROVED HOUSE TYPE GRANTED UNDER PLANNING REFERENCE NO: 19/50884 WITH ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
22/10/2019 |
N/A |
BALLYMACOOL , LETTERKENNY , LETTERKENNY PO |
CHANGE TO DESIGN OF DWELLING HOUSE PREVIOUSLY APPROVED UNDER PLANNING REF: 18/51746 INCLUDING A CHANGE TO THE MAIN ROOF FROM STEPPED DESIGN TO STRAIGHT ROOF AND INCLUSION OF 2 NO. SMALL PITCH ROOFS OVER THE BAY WINDOWS... login required. |
Details... |
1.1km |
22/10/2019 |
CONDITIONAL |
BALLYCONNELLY , LETTERKENNY , LETTERKENNY PO |
CONSTRUCTION OF A NEW DWELLING WITH ASSOCIATED SEWAGE TREATMENT SYSTEM AND SEPARATE DOMESTIC GARAGE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
590m |
21/10/2019 |
CONDITIONAL |
BOMANY , LETTERKENNY , LETTERKENNY PO |
ERECTION OF A ONE AND A HALF STOREY DWELLING HOUSE, DETATCHED DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
3km |
02/10/2019 |
N/A |
CARRYGALLEY , LETTERKENNY , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.5km |
20/09/2019 |
CONDITIONAL |
TULLYGAY , LETTERKENNY PO , CO DONEGAL |
PROVISION OF AN OFF LICENSE SUBSIDIARY TO THE MAIN RETAIL USE, WITHIN THE EXISTING SHOP/PETROL STATION T/A KERNANS SPAR... login required. |
Details... |
380m |
31/07/2019 |
CONDITIONAL |
BOMANY , LETTERKENNY , LETTERKENNY PO |
CONSTRUCTION OF A DWELLING HOUSE WITH DETACHED DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
230m |
19/06/2019 |
CONDITIONAL |
ROCKHILL HOUSE , ROCKHILL , LETTERKENNY |
AMENDMENT TO THE INTERNAL LAYOUT AND DESIGN OF ACCOMMODATION PREVIOUSLY APPROVED UNDER PLANNING REF: 17/50383 WITHIN FORMER STABLES/ARMY ACCOMMODATION TO PROVIDE 12 NO. EN-SUITE BEDROOMS AND 5 NO. 2 BEDROOM SELF- CATERTERING HOLIDAY APARTMENTS. WORKS INCLUDE PROVISION OF A COVERED... login required. |
Details... |
540m |
07/06/2019 |
CONDITIONAL |
BOMANY , LETTERKENNY PO , CO. DONEGAL |
(1) ERECTION OF DWELLING AND WASTE WATER TREATMENT SYSTEM WITH ASSOCIATED SITE WORKS, (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND (3) PROVISION OF SEWAGE TREATMENT SYSTEM TO SERVE EXISTING DWELLING ... login required. |
Details... |
1km |
31/05/2019 |
CONDITIONAL |
CREEVE GLEBE , LETTERKENNY PO , CO. DONEGAL |
ERECTION OF DWELLING, DOMESTIC GARAGE, WASTE WATER TREATMENT SYSTEM AND DEMOLITION OF EXISTING SHED WITH ASSOCIATED SITE WORKS ... login required. |
Details... |