2.3km |
12/05/2022 |
N/A (New Application) |
LISNAPASTE |
CONSTRUCTION OF A SLATTED SHED WITH EFFLUENT TANK, ROOFING OF AN EXISTING CATTLE CRUSH, THE PROVISION OF RAINWATER HARVESTING TANKS & ROOF MOUNTED SOLAR PANELS, AND ALL ASSOCIATED SITE-WORKS... login required. |
Details... |
480m |
09/05/2022 |
N/A (Pre-Validation) |
LAGHY |
(1) ATTIC CONVERSION AT FIRST FLOOR LEVEL OF EXISTING DWELLING (2) DOMESTIC GARAGE ALSO AT EXISTING DWELLING AND PERMISSION FOR DECOMMISSIONING OF AN EXISTING SEPTIC TANK AND INSTALLATION OF A TREATMENT SYSTEM WITH POLISHING FILTER... login required. |
Details... |
2.7km |
30/08/2021 |
Granted |
MUCKROS |
ERECTION OF DWELLING HOUSE WITH SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
20/02/2020 |
N/A |
GOLARD , LAGHY , DONEGAL PO |
CONSTRUCTION OF A TWO-STOREY DETACHED DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND CONSTRUCTION OF A PERCOLATION AREA, VEHICULAR ACCESS ONTO THE PUBLIC ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
10m |
09/01/2020 |
CONDITIONAL |
TULLYWEE , LAGHEY , DONEGAL PO |
(1) DETATCHED DOMESTIC GARAGE/STORE AND RELOCATION OF SEPTIC TANK & PERCOLATION AREA (2) CONVERSION OF AN INTEGRAL GARAGE TO HABITABLE SPACE INCLUDING REPLACEMENT OF THE GARAGE DOOR WITH A WINDOW ON THE FRONT ELEVATION AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
2.9km |
03/09/2019 |
CONDITIONAL |
RAFOARTY , BRIDGETOWN , DONEGAL PO |
(1) CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, FOUL SEWER TREATMENT PLANT & ALL ASSOCIATED SITE WORKS AND (2) DEMOLITION OF EXISTING FARM SHED TO FACILITATE THE PROPOSED DEVELOPMENT... login required. |
Details... |
2.4km |
29/08/2019 |
CONDITIONAL |
COXTOWN TD , LAGHEY , DONEGAL PO |
CONSTRUCTION OF AN EXTENSION LINKING TWO EXISTING DWELLINGS & ALL ANCILLARY SITEWORKS ... login required. |
Details... |
2.3km |
29/08/2019 |
CONDITIONAL |
LISNAPASTE , LAGHEY , DONEGAL PO |
CONSTRUCTION OF A SINGLE STOREY DWELLING, NEW ACCESS POINT TO ROAD, TREATMENT SYSTEM, PERCOLATION AREA, INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.3km |
26/08/2019 |
CONDITIONAL |
TRUMMAN WEST TD. , BRIDGETOWN , DONEGAL PO |
CONSTRUCTION OF A VEHICULAR ENTRANCE FROM THE PUBLIC ROAD L-6995-1 TO GAIN VEHICULAR ACCESS TO AN EXISTING FORESTRY FOR THE PURPOSE OF THINNING OF THE EXISTING TREES AND GENERAL MAINTENANCE OF THE FOREST... login required. |
Details... |
2.3km |
22/08/2019 |
CONDITIONAL |
LISNAPASTE TD , LAGHEY , DONEGAL PO |
COMPLETION OF WORKS TO EXISTING ACCESS LANE AND (2) ERECTION OF A DWELLING HOUSE WITH EFFLUENT TREATMENT SYSTEM & POLISHING FILTER... login required. |
Details... |
2.2km |
21/08/2019 |
N/A |
TRUMMAN WEST TD. , BRIDGETOWN , DONEGAL PO |
CONSTRUCTION OF A VEHICULAR ENTRANCE FROM THE PUBLIC ROAD L-6995-1 TO GAIN VEHICULAR ACCESS TO AN EXISITNG FORESTRY FOR THE PURPOSE OF THINNING OF THE EXISTING TREES AND GENERAL MAINTENANCE OF THE FOREST... login required. |
Details... |
2.5km |
15/08/2019 |
N/A |
COXTOWN TD , LAGHEY , DONEGAL PO |
CONSTRUCTION OF AN EXTENSION LINKING TWO EXISTING DWELLINGS AND ALL ANCILLARY SITE WORKS NECESSARY... login required. |
Details... |
2.2km |
30/07/2019 |
N/A |
TRUMMAN WEST TD. , BRIDGETOWN , DONEGAL PO |
CONSTRUCTION OF A VEHICULAR ENTRANCE FROM THE PUBLIC ROAD L-6995-1 TO GAIN VEHICULAR ACCESS TO AN EXISITNG FORESTRY FOR THE PURPOSE OF THINNING OF THE EXISTING TREES AND GENERAL MAINTENANCE OF THE FOREST... login required. |
Details... |
2.6km |
26/07/2019 |
CONDITIONAL |
CORMULLIN , LAGHEY , DONEGAL PO |
CONSTRUCTION OF DWELLING HOUSE WITH DETACHED SHED AND WASTEWATER TREATMENT SYSTEM AND ASSOCIATED POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.9km |
11/07/2019 |
N/A |
RAFOARTY TD , BRIDGETOWN , DONEGAL PO |
ERECTION OF DWELLING HOUSE, DOMESTIC GARAGE, FOUL SEWER TREATMENT PLANT AND ALL ASSOCIATED WORKS... login required. |
Details... |
2.3km |
26/06/2019 |
N/A |
LISNAPASTE TD , LAGHEY , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH EFFLUENT TREATMENT SYSTEM & POLISHING FILTER ... login required. |
Details... |
2.6km |
11/06/2019 |
CONDITIONAL |
MUCKROS , DONEGAL TOWN , DONEGAL PO |
ERECTION OF A TWO STOREY DWELLING HOUSE WITH CONNECTION TO THE PUBLIC SEWER AND ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) SHALL BE SUBMITTED TO THE PLANNING AUTHORITY... login required. |
Details... |
2.2km |
04/06/2019 |
CONDITIONAL |
ARDLENAGH & LURGANBOY , DONEGAL , CO. DONEGAL |
AN ELECTRICAL SUBSTATION TO SERVICE PREMISES AND ALL ASSOCIATED SITE AND ANCILLARY DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
28/05/2019 |
CONDITIONAL |
LISNAPASTE , LAGHY , DONEGAL PO |
DEMOLITION OF EXISTING DOMESTIC GARAGE, ALTERATIONS TO EXISTING FACADE OF DWELLING, ERECTION OF EXTENSION TO SIDE OF EXISTING DWELLING HOUSE, PERMISSION TO CLOSE UP EXISTING VEHICULAR ENTRANCE & CREATE NEW VEHICULAR ENTRANCE ONTO PUBLIC ROAD AND ERECTION OF NEW DOMESTIC GARAGE. ... login required. |
Details... |