400m |
05/05/2022 |
N/A (New Application) |
MURVAGH UPPER (GLEBE) |
ERECTION OF A NEW DWELLING HOUSE, PROPRIATORY WASTE WATER TREATMENT SYSTEM, PERCOLATION AREA AND ASSOCIATED SITE WORKS... login required. |
Details... |
520m |
12/04/2022 |
N/A (Pre-Validation) |
MURVAGH UPPER (GLEBE) |
DOMESTIC GARAGE AND ASSOCIATED SITE WORKS... login required. |
Details... |
350m |
17/02/2020 |
N/A |
MULLANACROSS , BALLINTRA , DONEGAL PO |
ERECTION OF A DWELLING HOUSE, EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
27/01/2020 |
CONDITIONAL |
DRUMANEEL , BRIDGETOWN , DONEGAL PO |
REMOVAL OF EXISTING BARN STYLE ROOF AND SIDE CLADDING FROM 2 NO WAREHOUSE/STORAGE UNITS AND REPLACEMENT OF THE SAME WITH APEX ROOF AND NEW SIDE CLADDING... login required. |
Details... |
3km |
17/01/2020 |
CONDITIONAL |
DROMORE AND BALLYMAGROARTY IRISH , BALLINTRA , DONEGAL PO |
DEMOLITION OF DWELLING, CONSTRUCTION OF A REPLACEMENT DWELLING, REFURBISHMENT OF SHEDS, WIDENING AND UPGRADING OF EXISTING DRIVEWAY, INSTALLATION OF SEPTIC TANK AND PERCOLATION AREA AND ASSOCIATED SITE WORKS... login required. |
Details... |
3km |
16/12/2019 |
N/A |
DROMORE AND BALLYMAGROARTY , BALLINTRA , DONEGAL PO |
DEMOLITION OF DWELLING, CONSTRUCTION OF A REPLACEMENT DWELLING, REFURBISHMENT OF SHEDS, WIDENING AND UPGRADING OF EXISTING DRIVEWAY, INSTALLATION OF SEPTIC TANK AND PERCOLATION AREA AND ASSOCIATED SITE WORKS... login required. |
Details... |
50m |
18/11/2019 |
REFUSED |
MURVAGH UPPER GLEBE , BALLINTRA , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK... login required. |
Details... |
2.3km |
02/10/2019 |
CONDITIONAL |
ROSSCANLAN , BALLINTRA , DONEGAL PO |
ERECTION OF EXTENSIONS TO SIDE AND REAR OF EXISTING DWELLING HOUSE... login required. |
Details... |
2.9km |
03/09/2019 |
CONDITIONAL |
RAFOARTY , BRIDGETOWN , DONEGAL PO |
(1) CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, FOUL SEWER TREATMENT PLANT & ALL ASSOCIATED SITE WORKS AND (2) DEMOLITION OF EXISTING FARM SHED TO FACILITATE THE PROPOSED DEVELOPMENT... login required. |
Details... |
2.9km |
29/08/2019 |
CONDITIONAL |
COXTOWN TD , LAGHEY , DONEGAL PO |
CONSTRUCTION OF AN EXTENSION LINKING TWO EXISTING DWELLINGS & ALL ANCILLARY SITEWORKS ... login required. |
Details... |
1.1km |
27/08/2019 |
CONDITIONAL |
BALLYBULGAN , BALLINTRA , DONEGAL PO |
ERECTION OF A DWELLING HOUSE AND INSTALLATION OF A SECONDARY AND TERTIARY TREATMENT SYSTEM AND DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD... login required. |
Details... |
2.9km |
15/08/2019 |
N/A |
COXTOWN TD , LAGHEY , DONEGAL PO |
CONSTRUCTION OF AN EXTENSION LINKING TWO EXISTING DWELLINGS AND ALL ANCILLARY SITE WORKS NECESSARY... login required. |
Details... |
1.1km |
12/08/2019 |
N/A |
BALLYBULGAN , BALLINTRA , DONEGAL PO |
ERECTION OF A DWELLING HOUSE AND INSTALLATION OF A SECONDARY TERTIARY TREATMENT SYSTEM AND DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD... login required. |
Details... |
2.9km |
11/07/2019 |
N/A |
RAFOARTY TD , BRIDGETOWN , DONEGAL PO |
ERECTION OF DWELLING HOUSE, DOMESTIC GARAGE, FOUL SEWER TREATMENT PLANT AND ALL ASSOCIATED WORKS... login required. |
Details... |