2.8km |
06/05/2022 |
N/A (Pre-Validation) |
CASTLECARY |
TO THE OUTLINE PLANNING PERMISSION REF: 19/50023 FOR CONSTRUCTION OF A DWELLING HOUSE WITH AN ON-SITE SEWERAGE SYSTEM TOGETHER WITH ASSOCIATED WORKS... login required. |
Details... |
1.6km |
29/04/2022 |
N/A (New Application) |
BALLYNALLY |
EXISTING GROUND FLOOR MALE CHANGING AREA AND STORAGE AREA AND SEPARATE LADIES CHANGING AREA AND PERMISSION FOR ERECTION OF AN EXTENSION TO EXISTING STRUCTURES TO INCORPORATE FIRST FLOORS FOR ADDITIONAL STORAGE FACILITIES INCLUDING NEW COMMON STAIRCASE, E... login required. |
Details... |
1km |
14/04/2022 |
N/A (New Application) |
GULLADOO |
(1) ERECTION OF A SINGLE-STOREY EXTENSION WITH ROOF DECK TO THE EXISTING SEMI-DETACHED HOUSE (2) CONNECTION INTO EXISTING DRAINAGE AND ON-SITE WASTEWATER DISPOSAL SERVICES WITH MINOR RELOCATION OF EXISTING SEPTIC TANK (3) SOLAR PANELS ON EXISTING HOUSE R... login required. |
Details... |
490m |
14/04/2022 |
N/A (New Application) |
CARROWNAFFE |
CONSTRUCTION OF A DETACHED DWELLING HOUSE ON AN EXISTING SERVICED SITE WITHIN AN EXISTING RESIDENTIAL CUL-DE-SAC DEVELOPMENT, CONNECTION TO EXISTING ON SITE SERVICES INCLUDING, CONNECTION TO THE COMMUNAL WASTE-WATER TREATMENT SYSTEM ALONG WITH ALL ANCILL... login required. |
Details... |
2.1km |
11/03/2022 |
N/A (Pre-Validation) |
BALLYRATTAN |
CONSTRUCTION OF A SINGLE STOREY IN STYLE DWELLING HOUSE WITH EFFLUENT TREATMENT PLANT AND ASSOCIATED PERCOLATION SYSTEM TOGETHER WITH A DOMESTIC GARAGE... login required. |
Details... |
1.7km |
13/01/2020 |
UNCONDITIONAL |
BALLYNALLY , MOVILLE , LIFFORD PO |
CONSTRUCTION OF A DWELLING, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
1.5km |
04/12/2019 |
CONDITIONAL |
TIRYRONE , MOVILLE , LIFFORD PO |
ERECTION OF A DWELLING WITH WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA, DETACHED GARAGE, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKS... login required. |
Details... |
1.9km |
12/11/2019 |
CONDITIONAL |
BALLYNALLY , MOVILLE , LIFFORD PO |
RETENTION AND COMPLETION OF A HARD CORED CAR PARK AREA AND RETENTION OF A BORED WELL PROVIDING A PORTABLE WATER SUPPLY WITH A STORAGE TANK CONNECTED TO THE WELL... login required. |
Details... |
1.5km |
06/11/2019 |
CONDITIONAL |
GULLADOO , MOVILLE , LIFFORD PO |
CONSTRUCTION OF AN AGRICULTURAL MACHINERY STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
440m |
04/11/2019 |
REFUSED |
COOLY , MOVILLE , LIFFORD PO |
ERECTION OF AN AGRICULTURAL SHED TO ABUT EXISTING AGRICULTURAL SHED AND CONCRETE YARD WALL ON SITE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
630m |
24/06/2019 |
CONDITIONAL |
CARROWNAFF , MOVILLE , LIFFORD PO |
CONSTRUCTION OF A DOMESTIC GARAGE ... login required. |
Details... |
1.3km |
04/06/2019 |
CONDITIONAL |
GLEBE , CASTLECAREY , LIFFORD PO |
ERECTION OF A DRY BED AGRICULTURAL SHED TO ABUT EXISTING DRY BED AGRICULTURAL SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
1.2km |
29/01/2019 |
CONDITIONAL |
GULLADOO , MOVILE , LIFFORD PO |
CONSTRUCTION OF A DWELLING HOUSE WITH INTEGRATED GARAGE, INSTALLATION OF AN ON-SITE SEWERAGE SYSTEM AND ALL ASSOCIATED WORKS ... login required. |
Details... |
1.2km |
16/01/2019 |
N/A |
GULLADOO , MOVILE , LIFFORD PO |
CONSTRUCTION OF A DWELLING HOUSE WITH INTEGRATED GARAGE, INSTALLATION OF AN ON-SITE SEWERAGE SYSTEM AND ALL ASSOCIATED WORKS ... login required. |
Details... |
2.8km |
15/01/2019 |
CONDITIONAL |
CASTLECARRY , REDCASTLE , LIFFORD PO |
CONSTRUCTION OF A DWELLING HOUSE AND INSTALLATION OF AN ON-SITE SEWERAGE SYSTEM TOGETHER WITH ASSOCIATED WORKS ... login required. |
Details... |
2.8km |
02/01/2019 |
N/A |
CASTLECARRY , REDCASTLE , LIFFORD PO |
CONSTRUCTION OF A DWELLING HOUSE, AND INSTALLATION OF AN ON-SITE SEWERAGE SYSTEM TOGETHER WITH ASSOCIATED WORKS ... login required. |
Details... |