1.2km |
04/03/2020 |
N/A |
GOLDRUM , TERMON , LETTERKENNY PO |
CONSTRUCTION OF A NEW DOMESTIC GARAGE... login required. |
Details... |
2km |
08/11/2019 |
CONDITIONAL |
CARNASAUL , TERMON , LETTERKENNY |
EXTENSION TO EXISTING DWELLING... login required. |
Details... |
2.6km |
02/08/2019 |
CONDITIONAL |
CURRIN DRUMLURGAGH , DRUMBRICK , TERMON LETTERKENNY |
(1) DEMOLITION OF EXISTING CLUBHOUSE / DRESSING ROOMS; (2) ERECTION OF A NEW CLUB HOUSE CONSISTING OF DRESSING ROOMS, MULTIFUNCTION ROOM, GYM AND AUXILIARY ROOMS; (3) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM (4) ALL OTHER ASSOCIATED WORKS... login required. |
Details... |
2.6km |
21/06/2019 |
CONDITIONAL |
DRUMDEEVIN , TERMON , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK... login required. |
Details... |
10m |
06/06/2019 |
N/A |
GOLDRUM , TERMON , LETTERKENNY PO |
(1) SITE LAYOUT CHANGES INCLUDING REDUCTION IN ROAD AND HARDSTANDING AREAS, REPOSITIONING OF THE ON-SITE WASTE WATER TREATMENT UNIT, REPOSITIONING OF GENERATOR HOUSING AND OMISSION OF EXTERNAL OIL TANK AND FENCE ENCLOSURE AND REVISED PARKING LAYOUT (2) REDUCTION IN THE FOOTPRINT OF THE WATER TREATMENT PLANT BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING (3) REDUCTION IN THE FOOTPRINT OF THE SLUDGE BUILDING BY AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING (4) MODIFICATIONS TO THE RAW WATER BALANCING TANK STRUCTURE, INCLUDING REDUCING ITS HEIGHT (5) MODIFICATIONS TO THE CLEAR WA... login required. |
Details... |
2.4km |
24/05/2019 |
CONDITIONAL |
THE CRAOIBHINN COMMUNITY CENTRE CURRIN , TERMON , LETTERKENNY PO |
CHANGE OF USE OF EXISTING CHANGING ROOMS TO A CHILD CARE FACILTIES, INCLUDING MINOR STRUCTURAL ALTERATIONS ... login required. |
Details... |
1.8km |
23/04/2019 |
CONDITIONAL |
FAWANS , TERMON , LETTERKENNY PO |
CONSTRUCTION OF A STORE TO SIDE OF EXISTING FILLING STATION BUILDING AND ASSOCIATED SITE WORKS ... login required. |
Details... |
620m |
17/04/2019 |
CONDITIONAL |
GOLDRUM , TERMON , LETTERKENNY P.O. |
DEMOLITION OF EXISTING DERELICT HOUSE AND ERECTION OF NEW REPLACEMENT DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM... login required. |
Details... |
2.4km |
10/04/2019 |
CONDITIONAL |
CURRIN , TERMON , LETTERKENNY PO |
(1) CONSTRUCTION OF AN EXTENSION COMPRISING OF MAINSTREAM CLASSROOM AND SET ROOM, AND (2) PROVISION OF A NEW ENTRANCE FOYER WITH ALL ASSOCIATED ALTERATIONS AND SITE WORKS TO ACCOMMODATE SAME ... login required. |
Details... |
2.5km |
13/03/2019 |
CONDITIONAL |
SKREEN UPPER , KILMACRENNAN , LETTERKENNY P.O |
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC SHED AND INSTALLATION OF A WASTEWATER TREATMENT SYSTEM... login required. |
Details... |
2.5km |
22/02/2019 |
CONDITIONAL |
SKREEN UPPER , KILMACRENNAN , LETTERKENNY PO |
CONSTRUCTION OF A NEW DWELLING WITH SEPARATE DOMESTIC GARAGE AND ASSOCIATED SEWAGE TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
2.5km |
13/02/2019 |
N/A |
SKREEN UPPER , KILMACRENNAN , LETTERKENNY P.O. |
CONSTRUCTION OF A NEW DWELLING WITH SEPARATE DOMESTIC GARAGE AND ASSOCIATED SEWAGE TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.8km |
23/01/2019 |
CONDITIONAL |
GORTNALARAGH , TERMON , LETTERKENNY PO |
CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO NEW SEPTIC TANK AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |