2.4km |
27/04/2022 |
N/A (New Application) |
PORT |
RETENTION & COMPLETION OF DETACHED SHED AND STORE FOR VEHICLE AND OUTBOARD ENGINE DIAGNOSTICS AND REPAIRS AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.3km |
20/04/2022 |
N/A (New Application) |
COOLSHANGAN |
(1) CONSTRUCTION OF (A) A PROPOSED SINGLE STOREY EXTENSION TO THE SIDE AND REAR OF EXISTING HOUSE (B) A NEW DOMESTIC GARAGE (2) RENOVATION OF EXISTING HOUSE INCLUDING AMENDMENTS TO THE FRONT FACADE OF THE EXISTING HOUSE (3) MINOR ADJUSTMENT WORKS TO EXIS... login required. |
Details... |
1.2km |
01/04/2022 |
N/A (New Application) |
COOLSHANGAN |
ERECTION OF A 27M HIGH MONOPOLE TELECOMMUNICATIONS STRUCTURE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMINICATIONS EQUIPMENT, ALL ENCLOSED BY SECURITY FENCING... login required. |
Details... |
180m |
18/02/2020 |
CONDITIONAL |
INVER GLEBE , INVER , DONEGAL PO |
DEMOLITION OF THE EXISTING DWELLING HOUSE AND SHEDS AND TO DECOMMISSION THE EXISTING SEPTIC TANK SYSTEM AND ERECTION OF A NEW REPLACEMENT DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.6km |
17/02/2020 |
N/A |
FANAGHANS , INVER , DONEGAL PO |
ALTERATIONS TO PREVIOUSLY APPROVED DWELLING PL REF:19/51130, ALTERATIONS TO INCLUDE A SMALL INCREASE IN FLOOR AREA, ASSOCIATED ELEVATION CHANGES AND SITE WORKS... login required. |
Details... |
2.4km |
07/02/2020 |
CONDITIONAL |
PORT , INVER , DONEGAL PO |
ERECTION OF A DWELLING HOUSE, EFFLUENT TREATMENT UNIT AND ASSOCIATED SITE WORKS... login required. |
Details... |
1.3km |
06/02/2020 |
CONDITIONAL |
KEELOGES TOWNLAND , INVER , DONEGAL PO |
ALTERATIONS AND EXTENSIONS TO AN EXISTING SINGLE-STOREY COTTAGE AND CONSTRUCTION OF A SINGLE-STOREY EXTENSION TO THE COTTAGE, ALL TO PROVIDE A 2 BEDROOM DETACHED DWELLING HOU... login required. |
Details... |
2.6km |
03/02/2020 |
N/A |
CASHELOOGARY , INVER , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
180m |
28/01/2020 |
N/A |
CRANNY LOWER , INVER , DONEGAL PO |
DEMOLITION OF EXISTING DWELLING HOUSE & SHEDS AND DECOMMISSIONING OF THE EXISTING SEPTIC TANK SYSTEM AND ERECTION OF A NEW REPLACEMENT DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2km |
23/01/2020 |
CONDITIONAL |
DRUMNAKILLY , INVER , DONEGAL PO |
CHANGE OF ROOF DESIGN FROM THAT APPROVED UNDER PERMISSION 19/50507... login required. |
Details... |
730m |
11/11/2019 |
REFUSED |
CRANNY LOWER , INVER , DONEGAL PO |
CONSTRUCTION OF A DORMER DWELLING HOUSE, DOMESTIC GARAGE AND FOUL SEWER TREATMENT PLANT... login required. |
Details... |
1.5km |
18/09/2019 |
UNCONDITIONAL |
BONNYGLEN , INVER , DONEGAL PO |
CONSTRUCTION OF A HOLIDAY HOME, TREATMENT SYSTEM, POLISHING FILTER AND ASSOCIATED SITEWORKS... login required. |
Details... |
1.4km |
11/09/2019 |
CONDITIONAL |
SONAMARA FANAGHAN , INVER , DONEGAL PO |
RENOVATIONS AND CONSTRUCTION OF A NEW PORCH/SUNROOM EXTENSION TO DWELLING... login required. |
Details... |
1.6km |
24/07/2019 |
CONDITIONAL |
FANAGHANS , INVER , DONEGAL PO |
(1) DEMOLITION OF EXISTING DERELICT DWELLING AND SHEDS ON SITE (2) CONSTRUCTION OF TWO STOREY DWELLING WITH ATTACHED GARAGE (3) ON-SITE EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND (4) NEW ENTRANCE, ACCESS ROAD AND ALL OTHER ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
10/07/2019 |
CONDITIONAL |
CASHELOOGARY , INVER , DONEGAL PO |
CHANGE OF HOUSE TYPE FROM THAT PREVIOUSLY GRANTED UNDER 16/51549 AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
710m |
01/07/2019 |
N/A |
CRANNY LOWER , INVER , DONEGAL PO |
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, DOMESTIC GARAGE AND FOUL SEWER TREATMENT PLANT ... login required. |
Details... |
730m |
01/07/2019 |
CONDITIONAL |
CRANNY LOWER TD , INVER , DONEGAL PO |
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, DOMESTIC GARAGE AN FOUL SEWER TREATMENT PLANT ... login required. |
Details... |
970m |
16/05/2019 |
REFUSED |
ARDAGHEY GLEBE , INVER , DONEGAL PO |
ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE , FOUL SEWER TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
990m |
03/05/2019 |
CONDITIONAL |
INVER GLEBE , INVER , DONEGAL P.O. |
ERECTION OF A DWELLING HOUSE WITH ATTACHED DOMESTIC GARAGE, SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.6km |
17/04/2019 |
CONDITIONAL |
BALLYBROLLAGHAN/DRUMATUMPHER , FROSSES , DONEGAL PO |
ATTACHED SINGLE STOREY DOMESTIC SHED TO REAR OF EXISTING TWO STOREY DWELLING AND PERMISSION FOR PROPOSED DETACHED SINGLE STOREY DOMESTIC SHED TO REAR GARDEN AND ALL ASSOCIATED SITE DEVELOPMENT WORKS OFF EXISTING ENTRANCE ... login required. |
Details... |