1.2km |
27/04/2022 |
N/A (Pre-Validation) |
ARDMALIN |
ERECTION OF DWELLING WITH ONSITE SEWAGE TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.8km |
27/04/2022 |
N/A (Pre-Validation) |
ARDMALIN |
CONSTRUCTION OF NEW DETACHED SINGLE-STOREY DWELLING AND NEW WASTEWATER TREATMENT PLANT WITH PERCOLATION AREA ALONG WITH CONNECTION TO EXISTING SERVICES... login required. |
Details... |
1.2km |
05/04/2022 |
N/A (New Application) |
ARDMALIN |
ERECTION OF A DWELLING WITH ONSITE SEWAGE TREATMENT PLANT, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.5km |
30/03/2022 |
N/A (New Application) |
ARDMALIN |
RENOVATION AND EXTENSION OF EXISTING DILAPIDATED DWELLING HOUSE, TOGETHER WITH AN ON-SITE SEWAGE SYSTEM AND ALL ASSOCIATED WORKS... login required. |
Details... |
930m |
28/03/2022 |
N/A (New Application) |
BREE |
ERECTION OF A DWELLING WITH ONSITE SEWAGE TREATMENT PLANT AND DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2km |
27/02/2020 |
CONDITIONAL |
ARDMALIN , MALIN HEAD , LIFFORD PO |
(1) AN INCREASED SIZE OF GARAGE SHED AND (2) CHANGE OF USE OF A GARAGE TO USE AS ANCILLARY ACCOMMODATION FOR IMMEDIATE FAMILY MEMBERS, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS... login required. |
Details... |
2.7km |
23/12/2019 |
CONDITIONAL |
BALLYKENNY , MALIN HEAD , LIFFORD PO |
ERECTION OF A SILAGE PIT... login required. |
Details... |
2.8km |
19/11/2019 |
CONDITIONAL |
WEST TOWN ARDMALIN , MALIN HEAD , LIFFORD PO |
GROUND WORKS TO PROVIDE A LEVEL BUILDING PLATFORM AND PERMISSION FOR ERECTION OF A SHED AND THE DEMOLITION OF A DERELICT BUILDING... login required. |
Details... |
2.8km |
06/11/2019 |
N/A |
WEST TOWN ARDMALIN , MALIN HEAD , LIFFORD PO |
GROUND WORKS TO PROVIDE A LEVEL BUILDING PLATFORM AND PERMISSION FOR ERECTION OF A SHED... login required. |
Details... |
1.9km |
10/09/2019 |
CONDITIONAL |
ARDMALIN , MALIN , LIFFORD PO |
ERECTION OF A DWELLING WITH WASTE WATER TREATMENT SYSTEM & PERCOLATION AREA, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKS INCLUDING ATTENUATION POND AN BYPASS SEPARATOR. A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION.... login required. |
Details... |
1.9km |
06/08/2019 |
CONDITIONAL |
SLIEVEBAWN , ARDMALIN , MALIN HEAD |
CONSTRUCTION OF A DWELLING , GARAGE, TREATMENT SYSTEM & ASSOCIATED SITE WORKS... login required. |
Details... |
2km |
22/07/2019 |
CONDITIONAL |
CULOORT , MALIN HEAD , LIFFORD PO |
CONSTRUCTION OF A VEHICLE ACCESS BRIDGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) FORMS PART OF THIS APPLICATION.... login required. |
Details... |
690m |
23/05/2019 |
CONDITIONAL |
BREE , MALIN HEAD , LIFFORD PO |
CONSTRUCTION OF A MACHINERY STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
1.9km |
27/02/2019 |
N/A |
ARDMALIN , MALIN , LIFFORD PO |
ERECTION OF A DWELLING WITH WASTE WATER TREATMENT SYSTEM & PERCOLATION AREA, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKS ... login required. |
Details... |
690m |
25/02/2019 |
REFUSED |
BREE , MALIN HEAD , LIFFORD PO |
CONSTRUCTION OF A MACHINERY STORAGE SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
2.1km |
16/01/2019 |
UNCONDITIONAL |
CULOORT , MALIN HEAD , LIFFORD PO |
CHANGE OF HOUSE TYPE DESIGN INCORPORATING EXISTING WALLSTEADS OF AN OLD COTTAGE RUINS. THE PROPOSED DESIGN DIFFERS FROM THAT APPROVED UNDER PLANNING PERMISSION REFERENCE 09/70462 (DURATION OF PERMISSION EXTENDED UNDER REF: 14/51121) ... login required. |
Details... |
140m |
14/01/2019 |
CONDITIONAL |
BALLYGORMAN , MALIN HEAD , LIFFORD PO |
CONSTRUCTION OF A NEW SINGLE STOREY DWELLING WITH SEPTIC TANK/TREATMENT PLANT AND PERCOLATION AREA ALONG WITH ASSOCIATED SITEWORKS AND CONNECTION TO SERVICES ... login required. |
Details... |