2.1km |
16/05/2022 |
N/A |
Higginstown , Kildery , Co. Kilkenny |
of the detached metal clad storage shed and all associated site development works... login required. |
Details... |
1.8km |
26/04/2022 |
N/A |
Regional Veterinary Laboratory , Hebron Industrial Estate , Hebron Road |
(1) Permission for Retention of (a) the installation of 2 no. portacabins for a temporary period of 5 years (these were granted permission for a temporary period of 5 years under planning reg. no. P10/58) and (b) the change of use o... login required. |
Details... |
480m |
20/04/2022 |
N/A |
Unit M , Purcellsinch Business Park , Dublin Road Purcellsinch |
for the following works.: The development will consist of the change of use from office use to apprenticeship workshops and classrooms, extension of unit with the c... login required. |
Details... |
1.3km |
21/03/2022 |
CONDITIONAL |
Long Meadows , Maudlinsland/Quarryland , Old Sion Road |
for change of dwelling design as previously permitted under P19/242 from a two storey four bedroom detached dwelling to five bedroom two storey detached dwelling at Site Nos. 19, 23 an 24 Long Meadows plus all associated works (Layout and services as permitted under P.19/242 unaffected)... login required. |
Details... |
2.7km |
25/02/2022 |
CONDITIONAL |
Higginstown , Co Kilkenny |
for a Proposed new part single storey & part two storey dwelling, proposed vehicular entrance, proposed garage, driveway, borewell, wastewater treatment system with percolation area, stormwater soakaways, landscaping and all associated site works... login required. |
Details... |
1.8km |
24/02/2022 |
REFUSED |
Fontenoy , Canal Walk , Castle Road |
for development at this site. The development will consist of the subdivision of existing dwelling plot for the construction of 2 no. detached 4-bedroom dormer dwellings. Access to the proposed dwellings will be via the utilization of the existing vehicular entrance to create a shared entrance to pr... login required. |
Details... |
1.8km |
11/02/2022 |
N/A |
Fontenoy , Canal Walk , Castle Road |
for development at this site. The development will consist of; the subdivisioin of existing dwelling plot for the construction of 2 no. detached 3 bedroom dormer dwellings. Access to the proposed dwellings will be via the utilization of the existing vehicular entrance to ... login required. |
Details... |
2km |
24/01/2022 |
N/A |
Hebron Road , Kilkenny |
for the installation of new flood-lighting to playing pitch consisting of 6 no. 18m high columns with LED floodlights... login required. |
Details... |
1.4km |
17/01/2022 |
REFUSED |
Cellarstown , Archersrath , Kilkenny |
for development at this site. The development will consist of: Construction of a 2-storey dwelling, new entrance to the public roadway, site treatment plant and percolation area, connection to services, new entrance to public roadway, landscaping and all associated siteworks... login required. |
Details... |
1.4km |
23/12/2021 |
N/A |
Cellarstown , Kilkenny |
for development at this site. The development will consist of Construction of a 2-storey dwelling, new entrance to the public roadway, site treatment plant, and percolation area, connection to services, new entrance to public roadway, landscaping and all associated siteworks... login required. |
Details... |
1.8km |
01/12/2021 |
N/A |
Acorn House , Lacken , Dublin Road |
for the development of a standalone single storey extension to the Amber Women's Refuge comprising a therapeutic and counselling space with sanitary accommodation inclusing all associated services at... login required. |
Details... |
1.3km |
05/11/2021 |
CONDITIONAL |
Unit 71-72 Hebron Industrial Estate , (Formerly Fineline Furniture) , Leggetsrath West |
for alterations to the existing external facades of the building, new entrance canopy, new external stairs, new external signage and all associated site works... login required. |
Details... |
2km |
29/10/2021 |
CONDITIONAL |
Kingsland , Johnswell Road , Co. Kilkenny |
to erect a 3 bedroom two storey dwelling house with sewage treatment system with partially raised soil polishing filter and associated site works... login required. |
Details... |
2km |
26/10/2021 |
CONDITIONAL |
38C Hebron Industrial Estate , Leggetsrath West , Kilkenny |
for the erection of an extension to an existing industrial unit and all associated site works... login required. |
Details... |
1.1km |
13/10/2021 |
CONDITIONAL |
Leggetsrath West , Hebron Industrial Estate , Kilkenny |
to carry out development on a 1.9 hectare site. The development will consist of the construction of a 1769sqm portal frame steel clad building to include 1254sqm of production space, 515sqm of office space, entrance from exis... login required. |
Details... |
2.1km |
12/10/2021 |
N/A |
Warrington , Kilkenny |
for existing holiday cottage to continue as a holiday cottage. This is a Protected Structure Ref. No. 831... login required. |
Details... |
1.8km |
29/09/2021 |
CONDITIONAL |
5 Hebron Park , Newpark Upper , Kilkenny |
to remove an existing detached shed and to construct a single storey extension to the side of a two-storey dwelling house and all associated works at ... login required. |
Details... |
50m |
28/09/2021 |
UNCONDITIONAL |
Cillin Hill , Leggetstath East , Dublin Road |
For planning permission ref. no. P 16/327... login required. |
Details... |
1km |
27/09/2021 |
CONDITIONAL |
Maxol Filling Station , Dublin Road , Kilkenny R95 HKD1 |
for a revision to the approved site forecourt and building layouts as approved under Reg Ref 18/795 to now include (a) retaining the existing forecourt canopy in lieu of the proposed canopy granted and the removal of part of and refurbishment of t... login required. |
Details... |
840m |
16/09/2021 |
CONDITIONAL |
Leggetsrath West , Dublin Road , Kilkenny |
for construction of a single storey motor sales office building and permission for the construction of illuminated signage and the completion of ancillary construction works... login required. |
Details... |