1.5km |
07/06/2024 |
N/A |
The Arches Bar & Restaurant, Bellevue, Ballydahin, Mallow, Co. Cork, P51A386 |
Permission for Retention of a single storey pavilion structure (floor area 203 sq.m) and will consist of two proposed acoustic lobbies (floor area 16.2 sq.m) which are located in the existing car park at the re... login required. |
Details... |
2.7km |
20/05/2024 |
N/A |
Lavally Upper, Mallow, co.Cork, |
Permission to construct a new dwelling house and all associated site works and enlarge existing entrance... login required. |
Details... |
940m |
17/05/2024 |
N/A |
ESB 110kv Station, St. Josephs Road, Carrigoon Beg, Mallow, Co. Cork |
Retention Permission for a temporary portacabin and permission for the demolition of a temporary portacabin and construction of a new pre-fabricated portacabin of 49s.q.m., and all associated site development works.... login required. |
Details... |
1.8km |
03/05/2024 |
N/A |
25 Dromore Drive, Ballydahin, Mallow, Co.Cork |
Permission for alterations to front and side of existing dwelling and for the construction of a single storey extension to the rear of same dwelling and all associated site works... login required. |
Details... |
1.8km |
24/04/2024 |
N/A |
Annabella, Mallow, Co Cork, |
Permission for the construction of a new Biomass Plant for the generation of steam as part of the decarbonisation road map for the business. The development will consist of the construction of a single storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height of 27.292m above grou... login required. |
Details... |
1.4km |
08/04/2024 |
Conditional Permission |
Ballydahin, Mallow, co.Cork, |
Permission to construct a single storey extension to the rear of the existing dwelling house including alterations with all associated site and ancillary works... login required. |
Details... |
1.8km |
05/04/2024 |
N/A |
Dairygold Mallow, Annabella, Mallow, Co Cork |
Permission for construction of a new Biomass Plant for the generation of steam as part of the decarbonization road map for the business. The development will consist of the construction of a single-storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height 24.342m above ground lev... login required. |
Details... |
1.3km |
02/04/2024 |
Conditional Permission |
11 Fair Street East, Mallow, Co.Cork, |
Permission for retention of a two storey rear extension... login required. |
Details... |
1km |
28/02/2024 |
Conditional Permission |
No. 9 Spa Terrace, Mallow, Co.Cork, |
Permission to demolish existing 2 storey rear extension to existing dwelling and to construct a new 2 storey extension to the rear of same dwelling and all associated site works... login required. |
Details... |
1.9km |
23/02/2024 |
N/A |
6 Dromore Drive, Ballydahin, Mallow, Co. Cork |
Permission for retention of the change of use of the domestic bedroom with en-suite to commercial use as a hairdressing salon with wash-room and ancillary services with all associated sire works.... login required. |
Details... |
1.5km |
22/02/2024 |
Refused |
Bank Of Ireland, 150 Bank Place, Main Street, Mallow, Co. Cork |
Permission to install a new external ATM with associated signage, and proposed new surround panel to the front elevation of the bank building with all associated site works (NIAH protected structure reference number 20815111)... login required. |
Details... |
1.5km |
14/02/2024 |
N/A |
Spa Glen, Mallow, Co.Cork, |
Permission for following Large Scale Residential Development (LRD) comprising the demolition of the existing farmhouse/buildings and the construction of 186 no. residential units, 1 no creche and all associated ancillary development works including the signalisation of the N72/L5331 junction to provide improved sightline visibility, amendments to part of the existing hedgerow... login required. |
Details... |
1.4km |
31/01/2024 |
Conditional Permission |
Bowling Green, Mallow, Co.Cork, |
Permission for 1)subdivision of an existing building to form two separate units, 2) change of use of one unit from fitness centre to a retail/workshop for a picture framing business, 3) construction of a single storey extensio... login required. |
Details... |
1.9km |
12/01/2024 |
N/A |
6 Dromore Drive, Ballydahin, Mallow, Co.Cork |
Permission for change of use of the domestic bedroom with en-suite to commercial use as a hairdressing salon with wash-room and ancillary services with all associated site works... login required. |
Details... |
940m |
21/12/2023 |
Conditional Permission |
Bearforest, Meadowlands, Ballyellis, Mallow, Co.Cork |
Permission for development which consists of a new water main pumping station. The development will consist of the erection of a new kiosk and the installation within such kiosk of 2 no. water pump sets and... login required. |
Details... |
690m |
20/12/2023 |
Conditional Permission |
No. 14 St. Joseph's Road, Mallow, Co. Cork, P51 P6WY |
Permission for retention of the existing dwelling as constructed (change of design from that previously granted under reference Mallow Town Council PD 1216 & PD 1416).... login required. |
Details... |
620m |
01/12/2023 |
Conditional Permission |
16 The Laurels, Castlepark, Mallow, Co Cork |
Permission for retention of changes made to roof, front and side elevations of the side extension previously granted planning permission (Pl.Reg.No. 16/7118) which was completed in 2017.... login required. |
Details... |
540m |
27/11/2023 |
N/A |
No. 3 Grianvar, Ballyellis, Mallow, Co.Cork |
Construction of dwelling house, entrance and associated services. Extension of Duration to Permission granted under Planning Ref. No. 18/5681 ... login required. |
Details... |
930m |
21/11/2023 |
N/A |
Ballyellis Bearforest, Meadowlands, Mallow, Co Cork |
New Water Main Pumping Station consisting of: 1) Erection of a new kiosk and the installation within such kiosk of 2 no. water pump sets and surge vessel tank for Killavullen and Rahan areas new supply from Mallow, and ass... login required. |
Details... |