2.2km |
30/05/2024 |
N/A |
Coolatanavally , Carrigrohane , Co. Cork |
Permission to construct a new dwelling house, new vehicular entrance, new domestic wastewater treatment system and all associated site works.... login required. |
Details... |
2.7km |
26/04/2024 |
N/A |
Carrigyknaveen, Inniscarra, Co.Cork, |
The construction of a shed for the purpose of storing vintage tractors... login required. |
Details... |
1.7km |
09/04/2024 |
CONDITIONAL |
13 Shournagh Drive , Blarney , Cork |
Permission for the demolition of an existing single-storey attached garage to side of the dwelling and for the construction of a new single-storey side extension consisting of a... login required. |
Details... |
1.6km |
22/03/2024 |
N/A |
Cloghphilip , Tower , Blarney |
Permission to construct a domestic shed and all associated site works.... login required. |
Details... |
810m |
20/03/2024 |
CONDITIONAL |
11 The Grove , Gleann Na Ri , Tower Blarney |
Permission for a single-storey rear extension to existing semi-detached single-storey dwelling along with any associated site works.... login required. |
Details... |
560m |
13/03/2024 |
CONDITIONAL |
Ard-Aulinn , Kielys Lane , Tower Blarney |
Permission for elevational changes to existing dwellinghouse consisting of the following: construction of new single-storey extension to the southern elevation, new two-storey ext... login required. |
Details... |
2.6km |
19/01/2024 |
REFUSED |
Sunberry , Killowen , Monacnappa |
Permission for the conversion of an agricultural shed to a 2-storey dwelling house and permission for alterations to the elevations of the shed to including windows and doors, new vehicular entrance, boundary wall/treatments and all associated works.... login required. |
Details... |
530m |
08/01/2024 |
CONDITIONAL |
13 Laureston Crescent , Tower , Blarney |
Permission to construct a 2nd storey side extension above existing ground floor, and convert existing garage to bedroom, including elevational alterations and all associated site works.... login required. |
Details... |
1.1km |
18/12/2023 |
CONDITIONAL |
Coolatubrid , Carrigrohane , Cork |
Permission for the construction of a farm machinery shed for the storage of vintage agricultural machinery to the side of the dwelling and ancillary works.... login required. |
Details... |
530m |
30/11/2023 |
N/A |
13 Laureston Crescent , Tower , Blarney |
Permission to construct a two-storey side extension and convert existing garage to bedroom, including elevational alterations and all associated site works.... login required. |
Details... |
440m |
20/11/2023 |
REFUSED |
Saint Anns Hill , Kilnamucky , Tower |
Permission for the construction of 4 single-storey assisted living dwelling units ( 4 no. 2 bedroom), new vehicular entrance, new pedestrian entrance, car parking spaces, bin store and all associated site works.... login required. |
Details... |
1.5km |
15/11/2023 |
CONDITIONAL |
Cloghphilip , Tower , Blarney |
Permission is sought for the construction of a single-storey one bedroom family flat adjoining the existing dwelling, for the installation of a new wastewater treatmen... login required. |
Details... |
0m |
13/11/2023 |
N/A |
Model Village , Coolflugh , Tower |
Permission to construct 2 no. single-storey dwellings together with all associated site development works.... login required. |
Details... |
1.9km |
13/11/2023 |
N/A |
The Former Blarney Hotel , and Golf Resort , Cloughphillip Blarney |
For permission and retention permission for development at The Former Blarney Hotel and Golf Resort, Cloughphillip, Blarney, Cork, T23V9TF. The development will consist of: Retention of extensions and alterations to the former hotel and permission for the change ... login required. |
Details... |
1.4km |
07/11/2023 |
N/A |
Hydro Farm , Kilnamucky , Tower Blarney |
Permission to erect a new two storey dwelling, domestic garage, septic tank, percolation area, a new vehicular entrance and all associated works... login required. |
Details... |
430m |
24/10/2023 |
CONDITIONAL |
No.6 Shournagh Valley , Tower , Blarney |
Permission to demolish existing roof and construct first-floor extension consisting of pitched roof with 5 no. dormer windows and velux rooflight, single-storey extension to side and porch extension to front, alterations to existing... login required. |
Details... |
440m |
24/10/2023 |
N/A |
Saint Anns Hill , Kilnamucky , Tower |
Permission for the construction of 4 single-storey assisted living dwelling units ( 4 no. 2 bedroom), new vehicular entrance, new pedestrian entrance, car parking spaces, bin store and all associated site works.... login required. |
Details... |
1.4km |
20/10/2023 |
CONDITIONAL |
Cloghphilip , Tower , Blarney |
Permission for the construction of new dwellinghouse and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works.... login required. |
Details... |
380m |
06/10/2023 |
CONDITIONAL |
No. 1 Dromin Drive , Tower , Blarney |
Permission for the following at No. 1 Dromin Drive, Tower, Blarney, Cork, T23PW74. (1) Conversion/ change of use of the existing detached domestic garage to ... login required. |
Details... |